  "schemaVersion": 1,
  "checkedAt": "2026-08-30",
  "release": {
    "geography": "Romania",
    "jurisdiction": "Romania",
    "status": "ANRE consultation material and 2026 regulatory changes; not a universal project cost",
    "object": "financial guarantees around electricity connection, capacity allocation and establishment authorisation"
  },
  "source": {
    "id": "anre-guarantee-procedure-2026",
    "title": "Proiect de Ordin pentru procedura garanției financiare",
    "url": "https://anre.ro/proiect-de-ordin-pentru-aprobarea-procedurii-privind-constituirea-executarea-si-restituirea-eliberarea-garantiei-financiare-prevazute-la-art-19%C2%B9-din-regulamentul-pentru-acordarea-licentelor-si-a/",
    "archive": "sources/archive/anre-proiect-ordin-2026-08.docx",
    "sha256": "6aab30e1771dc2ebd3d9d7a78be1d5b33816e1b512f37839791931d9debceac7"
  },
  "sources": [
    {
      "id": "anre-consultation",
      "title": "ANRE consultation page, 24 August 2026",
      "url": "https://anre.ro/proiect-de-ordin-pentru-aprobarea-procedurii-privind-constituirea-executarea-si-restituirea-eliberarea-garantiei-financiare-prevazute-la-art-19%C2%B9-din-regulamentul-pentru-acordarea-licentelor-si-a/",
      "archive": "sources/archive/anre-consultare-garantie-2026.html",
      "sha256": "67b821ce9142b94eeab4a2254ce4ea90d8d4c158bdec9ddc81e786167d898d01",
      "supports": ["consultation date", "30-day comment window", "links to draft order and approval note"]
    },
    {
      "id": "anre-may-2026",
      "title": "ANRE energy guarantees and connection changes, 21 May 2026",
      "url": "https://anre.ro/24931-2/",
      "archive": "sources/archive/anre-garantii-energie-2026.html",
      "sha256": "46edf9873f84c945bdd472c1bd481852697eb38a92ae666a050aad85259d7203",
      "supports": ["20% connection tariff", "20,000 EUR/MW allocation guarantee in 2026", "30 EUR/kW authorisation guarantee"]
    },
    {
      "id": "anre-approval-note",
      "title": "ANRE approval note for the draft procedure",
      "url": "https://anre.ro/wp-content/uploads/2026/08/Referat-de-aprobare-1.pdf",
      "archive": "sources/archive/anre-referat-aprobare-2026-08.pdf",
      "sha256": "f20e4304f1641cfeb0f792e3b5eb2cf4247bf1a38b0716315acf1a619664d6af",
      "supports": ["scope", "CfD exception", "storage and retechnology exceptions", "30 EUR/kW basis"]
    }
  ],
  "facts": {
    "connection": {
      "thresholdMW": 1,
      "operator": "greater than",
      "shareOfTariffExcludingVAT": 0.2,
      "priorShare": 0.05,
      "unit": "tariff excluding VAT",
      "sourceId": "anre-may-2026",
      "pureConsumptionBranchShare": 0.05,
      "pureConsumptionBranchNote": "separate branch when upstream reinforcement is needed"
    },
    "allocation2026": {
      "eurPerMW": 20000,
      "basis": "capacity requested for allocation",
      "exchangeRate": "BNR rate on the date of issue",
      "sourceId": "anre-may-2026",
      "separatePaymentGuaranteeShare": 0.01,
      "separatePaymentGuaranteeNote": "not part of the 20,000 EUR/MW participation figure"
    },
    "authorisation": {
      "eurPerKW": 30,
      "basis": "installed electrical power in the ATR",
      "sourceId": "anre-approval-note",
      "currentExceptions": [
        "CfD good-performance guarantee for the whole installed capacity",
        "retechnology without increased installed power"
      ],
      "draftProcedureAdditions": [
        "storage added at the same production or consumption site",
        "hybrid-project calculation and procedural treatment",
        "extension for a reason other than an unfinished project"
      ]
    }
  },
  "calculations": {
    "examplePowerMW": 100,
    "kilowattsPerMW": 1000,
    "authorisationExampleEUR": 3000000,
    "allocationExampleEUR": 2000000,
    "connectionFormula": "0.20 × T",
    "connectionTariffInput": "T is not supplied by the sources"
  },
  "boundaries": {
    "allProjectsFaceAllThree": false,
    "sameTime": false,
    "universalTotal": false,
    "cashBlocked": false,
    "financingSavings": false,
    "legalAdvice": false,
    "proposalIsLaw": false,
    "projectSpecificQuote": false
  },
  "review": {
    "readerValue": {
      "total": 15,
      "maximum": 16,
      "zeroCriteria": 0,
      "openingVariants": 3
    },
    "coldOpen": {
      "status": "pass",
      "reviewer": "Chandrasekhar",
      "reviewedAt": "2026-08-30T05:11:36Z",
      "questions": "The independent reviewer identified the subject, audience, reader operation, open stage/class question, and ANRE/date/conditionality trust cues. Exact trigger conditions remain in the body, as intended."
    },
    "highStakes": {
      "status": "pass",
      "owner": "release reviewer",
      "reviewer": "Gibbs",
      "reviewedAt": "2026-08-30T05:11:36Z",
      "harmfulEdgeTests": ["not all projects face all three guarantees", "current rule versus August draft", "connection tariff is not supplied", "no financing-savings or legal-advice claim"],
      "updateTrigger": "ANRE publishes a final procedure or changes the underlying guarantee rules"
    }
  }
}