# The Corinth Canal: the cut of 1893, on the line Nero began

In 1881, before the first pickaxe, the engineer Béla Gerster measured what was left on the isthmus of Nero’s works: two trenches, 2,000 m and 1,500 m long, and 27 shafts. The canal, he wrote, would run on exactly the same line.

Below, the line of the isthmus and today’s cut are drawn to scale, with everything that crossed here or meant to: ships on wheels, an emperor with a mattock, a ship 18.3 m wide and a road that goes under water.

- 6,343 m: length of the canal [S13]
- 24.6 m: width at sea level [S13]
- 79 m: highest point of the isthmus [S13]
- 18.3 m: widest ship allowed [S14]

![Seen from above, a ship with a green deck fills almost the whole width of the turquoise water between two steep walls.](/canalul-corint/assets/v01-ship-in-cut.442096c4c7b7.jpg)

A ship in the cut, seen from above, in March 2009.

Image: Sharon Mollerus · 13 March 2009 · CC BY 2.0 · [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Ship_Passing_through_the_Corinth_Canal_(3360701779).jpg)

## 01 · How much of the Corinth Canal did Nero dig?

The study for the modern canal was entrusted to the Hungarian engineer Béla Gerster. Before the digging began he explored, with trenches and soundings, what was left on the isthmus of Nero’s works, and in 1884 he published the measurements in a French archaeological journal. [S12, S11]

> “Although unfinished, Nero’s works left deep traces; with the cutting now begun, they will soon disappear.” (Gerster, 1884) [S11, S12]

### Three stretches between two gulfs

Along the chosen line Gerster divides the isthmus into three: 1.25 km of sand and alluvium on the Gulf of Corinth side, 4 km of hill and a 600 m plain towards the Saronic Gulf; together, 5.85 km. The hill is sand and marl under a layer of conglomerate two to three metres thick. Today’s canal specification gives the isthmus a maximum height of 79 m above the sea. [S11, S13]

**1.25 km · 4 km · 0.6 km**: the isthmus along the canal line, as Gerster describes it

### Two trenches, started from the two shores

Nero’s works, Gerster writes, follow a perfectly straight line. The western trench is 2,000 m long; the eastern one, 1,500 m. In his summary their depth varies between 3 and 30 m and their width reaches 40–50 m at the two ends of the line; of the eastern trench he notes, further on, that it “was dug as far as 60 metres”. The low part of the western trench, cut in the sand of the plain, is 1,200 m long; there the digging went below sea level too, at least over a certain length and width, as soundings showed. On either side the spoil stood in mounds up to 20 m high. [S11]

**2,000 m + 1,500 m**: Nero’s trenches, as measured by Gerster

### Two rows of shafts on the back of the hill

Between the trenches, on the hill, Gerster finds two rows of shafts facing each other, 40–45 m from the axis of the canal. He counts 27 shafts still visible, rectangular in section, 2 m by 3 or 3.5 m. He clears two and finds 30 m of rubble in each. Those cut in rock, their sides still sheer, had been 37–42 m deep. He reads them as soundings for the slope of the banks and perhaps as points of attack from above. [S11]

**27 shafts · 37–42 m**: shafts still visible in 1881, and the depth of those cut in rock

### The same line, chosen a second time

The engineers of 1881 surveyed the whole isthmus and studied four routes. They chose Nero’s: the canal under construction, Gerster writes, “will coincide exactly” with it. The operator’s report for 2024 speaks of three routes studied and likewise of “the route of Nero”, judged more accurate and more economical. Today’s canal measures 6,343 m, of which 540 m are the ports at its ends. It was dug along the same line, and for that reason, the researcher Walter Werner notes in 1997, nothing of the trenches has survived. A relief carved in the southern wall of the canal can still be seen, 1.5 m high: a Heracles, usually put down to Nero’s workmen. [S11, S05, S13, S16, S03]

**6,343 m**: length of today’s canal, including 540 m of ports at its ends

![Béla Gerster’s plate of 1881: a map of the isthmus with the canal line and, below it, sections through the trenches attributed to Nero.](/canalul-corint/assets/v03-nero-gerster.a7357a592b35.jpg)

Gerster’s plate, “Carte du canal de Corinthe indiquant les travaux de Néron”: “Vestiges du Canal de Néron” means “remains of Nero’s canal”, and “Travaux de Néron”, “Nero’s works”.

Image: Bela Gerster · 1881 · public domain · [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Remains_of_Nero%27s_Isthmus_Canal_in_1881.jpg)

![View from an aircraft: a strip of land, with a town on the shore, between two stretches of blue water.](/canalul-corint/assets/v01-isthmus-aerial.fc41824b36b7.jpg)

The Isthmus of Corinth from the air in June 2018: the land between the two gulfs.

Image: Wolfgang Moroder · 29 June 2018 · CC BY-SA 3.0 · [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Corinth_Canal_Greece_aerial_view.jpg)

## 02 · Who else wanted to cut the Isthmus of Corinth?

Pliny the Elder names four: King Demetrius, the dictator Caesar, the princeps Gaius, that is the emperor Caligula, and Domitius Nero. All of them, he writes, tried to cut the narrows with a navigable channel. Only the last one’s work was there for Gerster to measure on the ground. [S02, S11]

> Pliny calls the attempt “ill-omened, as the end of them all made plain”. [S02]

### Half a line in Diogenes Laertius

Of Periander, tyrant of Corinth, Diogenes Laertius records only this: he wanted to cut through the Isthmus. The sentence sits between a maxim and a letter. The canal company’s history adds the year 602 BCE and an oracle said to have stopped him: “Do not fortify the isthmus nor dig it.” In Herodotus, whom Gerster cites, those words are the Pythia’s answer to the people of Cnidus, about their own isthmus. [S06, S11, S12]

**“he wanted to cut the Isthmus”**: all that Diogenes Laertius says of Periander’s plan

### The engineers and the level of the sea

Strabo reports, after Eratosthenes, that Demetrius tried to cut the Isthmus for his fleets and was stopped by his engineers. They had taken measurements and told him the sea in the Corinthian Gulf stood higher than at Cenchreae: with the land cut, Aegina and the islands around it would be submerged. Strabo calls the opinion ignorant. Gerster allows the engineers a point: the tides at the two ends do not keep the same hours, so a difference of level of about a metre arises between the seas. In the canal, the operator says, the current usually turns every six hours and approaches 2.5 knots. [S07, S11, S24]

**2.5 knots**: usual rate of the current in the canal, according to the operator

### A plan and a centurion

Suetonius lists the canal through the Isthmus among Caesar’s projects, between draining the Pomptine marshes and checking the Dacians who had poured into Pontus and Thrace; his death cut them all short. Of Caligula he says that he had planned, above all, to dig through the Isthmus in Achaia and had already sent a chief centurion to survey the work. [S08]

**one centurion**: sent by Caligula to survey the work, according to Suetonius

### The trumpet, the mattock and the basket of earth

In Suetonius, Nero calls together the praetorian guard, urges them to the work and, at a trumpet signal, is first to break ground with a mattock and carries off a basketful of earth on his shoulders. In Cassius Dio the workers shrink back, frightened by omens, and the emperor grasps the mattock himself. Josephus writes that Vespasian chose 6,000 of the strongest young men and sent them to Nero, to dig; Gerster adds that they came from Galilee. Neither Suetonius nor Dio says what the mattock was made of. The gold comes from a dialogue preserved among Lucian’s works, in which the governor of Greece hands the emperor a golden mattock and he strikes the earth “three times, I think”, says the narrator. Werner places the start, probably, in 67 CE. On the ground, Gerster was to find 3.5 km of trench. [S08, S23, S09, S10, S05, S11]

**6,000**: prisoners sent by Vespasian to the Isthmus, according to Josephus

## 03 · What was the Diolkos?

Strabo gives the name Diolkos to the place where the Isthmus is 40 stadia wide and where ships are hauled overland from one sea to the other. The earliest record, the Greek Ministry of Culture points out, is in Thucydides: in the summer of 428 BCE the Spartans prepare hauling gear at the Isthmus to take their fleet across. [S25, S03]

The road had a limit. Ships too large to be carried on wagons, Pliny writes, took the long and risky way round the Peloponnese, past Cape Malea. [S02, S01]

> “When you double Maleae, forget your home,” ran a proverb Strabo quotes. Merchants from Italy and from Asia preferred to land their cargoes at Corinth. [S01]

### A road brought to light in 1956

The archaeologist Nikolaos Verdelis found the Diolkos in 1956, after building work inside the army’s School of Engineering. The road is paved with large blocks of soft limestone laid on sand and gravel, and crosses the Isthmus in a curve from north-west to south-east. The Ministry estimates its full length at 7–9 km; Werner counts 1,100 m known from excavation. [S03, S05]

**1956**: the year Verdelis finds the Diolkos

### Between 3.6 and 4.2 m of stone

The chronicle of the 1956 excavations, published a year later, describes a roadway of limestone slabs 3.6 to 4.2 m wide, uncovered at that time over 80 m; a note on the 1957 excavations records, over 160 m, widths between 3.5 and 5 m. Werner likewise measures 3.6–4.2 m. For the whole road the Ministry’s brochure records between 3.4 and 6 m. [S04, S05, S03]

**3.6–4.2 m**: width of the paving in the chronicle of the 1956 excavations

### Two grooves, 1.5 m apart

The slabs carry two parallel grooves, 1.5 m apart; the wheels of the carts that carried the ships ran in them. Werner finds the same gauge throughout but grooves of different kinds: in one stretch they are wear marks, in another they were cut on purpose to guide the wheels, and in places there are none. The Ministry’s brochure gives 1.4 m and, for a stretch found recently, 1.45 m. The cart has not survived: the chronicle published in 1957 suspects a simple wheeled frame. [S04, S05, S03]

**1.5 m**: distance between the grooves, in the 1957 chronicle and in Werner

### How old the road is

Verdelis dated the road from the sherds in the fill of its foundations and from the letters carved in the slabs: the end of the seventh or the start of the sixth century BCE, Periander’s time. The Ministry of Culture keeps that date. The author of the chronicle published in 1957 objected that the letters cannot be dated even to within a century, and Werner writes that it is not known when the road was built: for Thucydides it was already old, and an earlier, simpler slipway remains possible. The last mention of its use is from the twelfth century. Today the canal cuts it in two and, at 24.6 m, is almost six times as wide as the paving’s 4.2 m. [S04, S03, S05, S13]

**almost 6 times**: how much wider today’s canal is than the Diolkos paving

![A wide track with stone slabs along its middle runs down between two mounds of dry grass towards the water.](/canalul-corint/assets/v02-diolkos-remains.22be3177cd4e.jpg)

The Diolkos paving at Poseidonia in May 2019, beside the western end of the canal.

Image: George E. Koronaios · 22 May 2019 · CC0 · [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Remains_of_the_ancient_diolkos_of_Corinth_on_22_May_2019.jpg)

## 04 · Who built the Corinth Canal, and how long did it take?

The Suez Canal opens in 1869. That November the Zaimis government passes the law on cutting the Isthmus of Corinth, which lets the Greek state grant a company or an individual the right to build the canal and operate it. [S16, S12]

> The 1911 Britannica: the canal’s narrowness and the strength of its current “seriously detract from its utility”. [S17]

### A French contract, then a Hungarian general

In 1870 the state signs a contract with French entrepreneurs; the operator’s report says that, after the law, the project was assigned to the French engineers E. Piat and M. Chollet. Nothing comes of it. In 1881 the project is awarded to General István Türr, with a 99-year right to operate the canal. [S12, S16]

**99-year**: concession granted to General Türr in 1881

### 23 April 1882

Work starts on 23 April 1882, in the presence of King George I. The International Company of the Corinth Maritime Canal, founded by Türr with the backing of a French bank, has 60,000 shares of 500 francs each: 30 million francs. The study is Béla Gerster’s. The rock is broken with dynamite from the Nobel family’s factories. [S12, S16]

**23 April 1882**: start of the works, according to the operator’s history

### After some eight years the money runs out

The operator’s history puts the stoppage down to Türr’s bankruptcy and lack of money, after about eight years of work. The report for 2024 dates it to 1890. The project is carried on by a Greek company under Andreas Syngros, and the digging is assigned to the contracting firm of A. Matsas until completion. [S12, S16]

**1890**: the year the works stop for lack of money and are taken over

### 25 July 1893, after 11 years

The canal is inaugurated on 25 July 1893, after 11 years of works. The 1911 Britannica records its opening to navigation in November 1893 and a total cost of 70 million francs. It also counts: up to 31 July 1906, 37,214 vessels had passed, and in 1905, 2,930, of which 2,735 were Greek. The operator’s report for 2024 speaks of more than 11,500 transits a year. [S12, S16, S17]

**25 July 1893**: the inauguration, after 11 years of works

![Old photograph: a deep cut between two sloping walls with visible strata; on its floor, workers, rails and machinery, and above, a service bridge.](/canalul-corint/assets/v04-construction-cut.9b682275092d.jpg)

The canal works around 1890: workers, rails and machinery on the floor of the cut.

Image: Unknown author · about 1890 · public domain · [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Corinth_Canal_construction.jpg)

![Painting: a group of men in uniform on a quay, a carriage with two horses and, on the water, masted ships.](/canalul-corint/assets/v05-volanakis-inauguration.9707bc2ae776.jpg)

Konstantinos Volanakis, “After the inauguration, Corinth Canal”, painted about 1893.

Image: Konstantinos Volanakis · about 1893 · public domain · [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Constantine_Volanakis_-_After_the_inauguration,_Corinth_canal_1893.jpg)

## 05 · Which ships can pass through the Corinth Canal?

The canal cuts the isthmus in a straight line, on a bearing of 131.5 degrees. It is 6,343 m long and 24.6 m wide at the water: almost 258 times as long as it is wide. The drawing alongside keeps one scale across and up. [S13]

> Between the widest ship allowed, kept on the canal’s axis, and the wall there are, at the waterline, 3.15 m on each side. [S13]

### 24.6 m at sea level

The operator’s specification gives the maximum width safe for navigation: 24.6 m at sea level, at mean low water. The measure is an old one: the 1911 Britannica says the canal is only 24.60 metres broad at the surface. [S13, S17]

**24.6 m**: maximum width safe for navigation, at sea level

### 21 m on the bed and 8 m deep

On the bed the canal is 21 m wide, and its depth on the axis is 8 m from mean low water. For most of its length the banks are faced with masonry from the bed to 2 m above the sea. At certain points, the operator says, the canal has widened through landslides caused by earthquakes, by bombing in the Second World War and by erosion. [S13, S24]

**21 m · 8 m**: width on the bed and depth on the axis

### 79 m of land, 52 m under the bridges

At its highest point the isthmus reaches 79 m above the sea. The rail and road bridges limit a ship’s height to 52 m. At night the flanks are marked by amber lamps set opposite each other in pairs, every 100 metres. [S13, S24]

**79 m · 52 m**: maximum height of the isthmus and clearance under the bridges

### 18.3 m wide at most, and 6 knots

The regulations admit no ship wider than 18.3 m (60 feet); for those under 14 m wide the maximum draught is 7.2 m, at normal water level and in normal weather. Speed may not exceed 6 knots: at that limit the 6,343 m take at least 34 minutes. Ships keep about one nautical mile apart. Towing is compulsory from 800 net register tons up, and at night a pilot is compulsory above 100. [S14, S24]

**18.3 m**: maximum width of a ship; kept on the axis, it has 3.15 m at the waterline on each side

## 06 · How do the sinking bridges work?

At each end of the canal a road crosses the water at sea level on a metal bridge that sinks: at Poseidonia since 1985, at Isthmia since 1987. They were built mainly for local journeys. [S15]

> The bridges go down only when a ship passes. [S15]

### 33 m long, 7 m wide, two lanes

Each deck is 33 m long and 7 m wide, with two traffic lanes. It is open to private cars only, and the permitted load is 300 kg per square metre. [S15]

**33 m × 7 m**: the deck of each bridge, according to the operator

### 15 minutes before the ship

The operator’s rule: a bridge is sunk only when a ship passes. For safety, the procedure begins 15 minutes before the ship approaches. [S15]

**15 minutes**: how long before the ship the procedure begins

### 4 m a minute

The deck sinks vertically at 4 m a minute. Sinking it takes about 3.5 minutes, and so does bringing it back up. [S15]

**4 m a minute**: speed of the deck; sinking or refloating takes about 3.5 minutes

### The ship passes above the road

With the deck under water, the ship enters the canal over the place where cars were crossing a little earlier. At Poseidonia the bridge goes down right beside the western end of the Diolkos: the archaeological site, the Ministry of Culture notes, lies at the point where the sinking bridge works today. [S15, S03]

**Poseidonia**: the bridge here stands beside the western end of the Diolkos

![A motor boat passes between the striped piers of the bridge; the deck cannot be seen, it is under water.](/canalul-corint/assets/v06-submersible-isthmia.d47494eb886a.jpg)

Isthmia, June 2017: the deck is down and the boat passes above it.

Image: Gregor Hagedorn · 6 June 2017 · CC BY-SA 4.0 · [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Bridge_of_Corinth_Canal_at_Isthmia_lowered_into_the_water,_with_boat_passing,_2017.jpg)

## 07 · Why was the Corinth Canal closed?

The walls of the cut give way from time to time: the operator itself writes that landslides have widened the canal at certain points. On 15 January 2021 a landslide stopped navigation. The work on the slopes took more than five years, with periods of navigation between its stages. [S24, S18, S28, S20]

> 17 June 2026: the operator announces that the canal is open to navigation again. [S20]

### 15 January 2021

Three days after the slide, on 18 January, the operator announces that the canal will stay closed to navigation longer than first estimated. It is working, the notice says, with the Hellenic Survey of Geology and the University of Athens School of Geology, and the aim is twofold: restoring the depth and making the slopes stable. [S18]

**15 January 2021**: the landslide that stops navigation

### Announced open from 1 June to 30 September 2023

In May 2023 the operator announces, following the works schedule, that the canal will be available for navigation from 1 June to 30 September. From 1 October the works move to their final stage, and the return to full round-the-clock operation is estimated for February 2024. [S19]

**1 June–30 September 2023**: navigation window announced in May 2023

### Two more winters of works

The date is not met. In October 2024 the operator announces that the canal is available until Sunday, 3 November 2024; on the Monday the “last phase” of the works begins. The canal reopens on 8 March 2025, with navigation announced until 2 November and the works expected to be complete by January 2026. On 7 October another notice comes: the canal stays open only until Tuesday, 14 October 2025, at 6 in the morning. [S27, S28, S29]

**8 March–14 October 2025**: the 2025 navigation period, according to the operator’s notices

### 17 June 2026

After eight months closed, the notice of 17 June 2026 says the canal is open to navigation again, the main phase of the critical slope-stabilisation works being complete. The decision, the operator adds, was taken by the relevant ministry once it was confirmed that the conditions for safe operation had been met. In 2026 the canal is 133 years old. [S20, S29]

**17 June 2026**: the operator’s latest reopening notice

## Sources and method

### How to read the drawings and the numbers

- **Gerster and those who summarise him.** Nero’s trenches are given here from Gerster’s article of 1884. Later summaries differ: Werner writes 1,300 m for the eastern trench and 32 shafts of 40 m, and the operator’s report speaks of three routes studied, not four. Gerster’s estimates (more than half a million cubic metres dug, three to four months of work, five to six thousand workers) are his own calculations, made knowing the number Josephus gives. [S11, S05, S16]
- **Two different lengths.** The 5.85 km are the sum of the three stretches of ground Gerster describes. The 6,343 m in the operator’s specification are measured along the canal’s axis between two points fixed 83 m and 40 m from the jetties of the two ports, and include 540 m of ports. [S11, S13]
- **What is drawn freehand.** Only lengths that carry a measurement are to scale. The outline of the hill, the floors of the trenches, the place of each shaft, the slope of the walls, the ship’s shape and draught, the quay, the bed at the bridges and the depth to which the deck sinks are drawn freehand: the sources read do not give them. [S11, S13, S15]
- **Calculated numbers.** Three values are calculated from the published ones: the ratio of almost 258 between length and width (6,343 : 24.6), the 3.15 m left on each side of a ship kept on the axis ((24.6 − 18.3) : 2) and the at least 34 minutes of the passage (6,343 m at 6 knots, without the slowing at entry and exit). [S13, S14]
- **Where the sources disagree.** The Ministry of Culture’s brochure puts the start of the works on 22 April 1882 and the inauguration in 1892; the operator, on 23 April 1882 and 25 July 1893. The operator’s dates are used here; for the year of opening, 1893, they agree with the 1911 Britannica. Quotations from French, Latin and Greek are translations made for this text. [S03, S12, S16]

The operator’s list of notices, read on 9 October 2026, has no notice of a canal closure after the reopening of 17 June; the latest concern tolls and temporary stoppages of the sinking bridges. [S20, S26]

### Sources

- S01: Strabo, Geography 8.6.20: https://penelope.uchicago.edu/Thayer/E/Roman/Texts/Strabo/8F*.html
- S02: Pliny the Elder, Natural History 4.9–10: https://penelope.uchicago.edu/Thayer/L/Roman/Texts/Pliny_the_Elder/4*.html
- S03: Greek Ministry of Culture, Ephorate of Antiquities of Corinthia: brochure “The Diolkos of Corinth”: https://ep.culture.gr/el/Documents/%CE%94%CE%97%CE%9C%CE%9F%CE%A3%CE%99%CE%9F%CE%A4%CE%97%CE%A4%CE%91%20-%20%CE%A0%CE%A1%CE%9F%CE%92%CE%9F%CE%9B%CE%97/%CE%95%CE%A1%CE%93%CE%91%20%CE%95%CE%A3%CE%A0%CE%91%202021%202027/%CE%9F%20%CE%94%CE%99%CE%9F%CE%9B%CE%9A%CE%9F%CE%A3%20%CE%A4%CE%97%CE%A3%20%CE%9A%CE%9F%CE%A1%CE%99%CE%9D%CE%98%CE%9F%CE%A5.pdf
- S04: Georges Daux, “Le diolkos de l’Isthme”, Bulletin de correspondance hellénique 81 (1957), pp. 526–529: chronicle of Verdelis’s excavations of 1956: https://www.persee.fr/doc/bch_0007-4217_1957_num_81_1_8208
- S05: Walter Werner, “The largest ship trackway in ancient times: the Diolkos of the Isthmus of Corinth, Greece, and early attempts to build a canal”, International Journal of Nautical Archaeology 26.2 (1997), pp. 98–119: https://tc301-athens.com/wp/wp-content/uploads/2024/10/werner1997.pdf
- S06: Diogenes Laertius, Lives of the Philosophers 1.99 (Periander): https://www.perseus.tufts.edu/hopper/text?doc=Perseus%3Atext%3A1999.01.0258%3Abook%3D1%3Achapter%3D7
- S07: Strabo, Geography 1.3.11: https://penelope.uchicago.edu/Thayer/E/Roman/Texts/Strabo/1C*.html
- S08: Suetonius: Nero 19, Julius 44, Caligula 21: https://penelope.uchicago.edu/Thayer/E/Roman/Texts/Suetonius/12Caesars/Nero*.html https://penelope.uchicago.edu/Thayer/E/Roman/Texts/Suetonius/12Caesars/Julius*.html https://penelope.uchicago.edu/Thayer/E/Roman/Texts/Suetonius/12Caesars/Caligula*.html
- S09: Josephus, The Jewish War 3.540: https://lexundria.com/j_bj/3.540/wst
- S10: “Nero, or the digging of the Isthmus”, a dialogue preserved among Lucian’s works: https://ancientlibrary.net/philostratus-nero/
- S11: Béla Gerster, “L’Isthme de Corinthe: tentatives de percement dans l’antiquité”, Bulletin de correspondance hellénique 8 (1884), pp. 225–232: https://www.persee.fr/doc/bch_0007-4217_1884_num_8_1_4110 https://www.persee.fr/doc/bch_0007-4217_1884_num_8_1_4110?pageId=T1_229 https://www.persee.fr/doc/bch_0007-4217_1884_num_8_1_4110?pageId=T1_230 https://www.persee.fr/doc/bch_0007-4217_1884_num_8_1_4110?pageId=T1_231 https://www.persee.fr/doc/bch_0007-4217_1884_num_8_1_4110?pageId=T1_232
- S12: Corinth Canal S.A., “The history of the Canal”: https://corinthcanal.com/the-canal/the-history-of-the-canal/?lang=en
- S13: Corinth Canal S.A., specifications: https://corinthcanal.com/the-canal/specifications/?lang=en
- S14: Corinth Canal S.A., navigation regulations: https://corinthcanal.com/regulations/?lang=en
- S15: Corinth Canal S.A., technical services: description of the bridges: https://corinthcanal.com/technical-services/?lang=en
- S16: Corinth Canal S.A., Sustainability Report 2024: https://corinthcanal.com/wp-content/uploads/2026/04/AEDIK-EN-31-1-26.pdf
- S17: Encyclopaedia Britannica 1911, article “Greece”, vol. 12: https://en.wikisource.org/wiki/Page:EB1911_-_Volume_12.djvu/455
- S18: Corinth Canal S.A., notice of 18 January 2021: https://corinthcanal.com/press-release-information-on-corinth-canals-transit-suspension-due-to-landslide/?lang=en
- S19: Corinth Canal S.A., notice of 18 May 2023: https://corinthcanal.com/press-release-canal-reopening-update/?lang=en
- S20: Corinth Canal S.A., “Corinth Canal Reopening”, 17 June 2026: https://corinthcanal.com/corinth-canal-reopening-dear-partners/?lang=en
- S23: Cassius Dio, Roman History, epitome of Book 62 in the Loeb edition (63.16 in the older numbering): https://penelope.uchicago.edu/Thayer/E/Roman/Texts/Cassius_Dio/62*.html
- S24: Corinth Canal S.A., general information: https://corinthcanal.com/the-canal/general-information/?lang=en
- S25: Strabo, Geography 8.2.1: https://penelope.uchicago.edu/Thayer/E/Roman/Texts/Strabo/8B*.html
- S26: Corinth Canal S.A., latest notices (the Greek and the English list), read on 9 October 2026: https://corinthcanal.com/wp-json/wp/v2/posts?per_page=10&_fields=date,link,title https://corinthcanal.com/wp-json/wp/v2/posts?per_page=10&lang=en&_fields=date,link,title
- S27: Corinth Canal S.A., notice of 14 October 2024: https://corinthcanal.com/press-release-announcement-for-the-closing-of-the-canal-as-the-restoration-work-will-restart-2/?lang=en
- S28: Corinth Canal S.A., notice of 4 March 2025: https://corinthcanal.com/press-release-corinth-canal-reopening-update/?lang=en
- S29: Corinth Canal S.A., notice of 7 October 2025: https://corinthcanal.com/press-release-announcement-for-the-closing-of-the-canal-as-the-restoration-work-will-restart-3/?lang=en