{
  "metadata": {
    "language": "en",
    "generated": "2026-08-12",
    "phase": 3,
    "mechanism_count": 9,
    "guide_count": 2
  },
  "section": {
    "kicker": "Mechanisms without a direct predecessor",
    "title": "New mechanisms: how the Code may change the city, not only the file",
    "intro": "The 100 comparisons follow what happens to the previous rules. Nine mechanisms without a clean predecessor — from the metropolitan plan and regeneration to informal settlements and the coastal rule — are explained separately.",
    "distinction": "These mechanisms have different states: some appear in the published Code, which commences on 25 August 2026, while others develop institutions and programmes that already exist. None of them, by label alone, has the effect of a permit, a property transfer or operational infrastructure."
  },
  "mechanisms": [
    {
      "id": "mechanism-pugzm",
      "kind": "mechanism",
      "target": "#mechanism-pugzm",
      "number": "01",
      "kicker": "Metropolitan scale",
      "title": "Several localities may share one metropolitan general plan",
      "reader_question": "Will the city and surrounding communes continue to plan separately?",
      "summary": "The PUGZM is an optional planning document for coordinated metropolitan development. Each local authority approves it for itself, and commencement is progressive.",
      "status_key": "future_code",
      "status_label": "Code mechanism, not yet in force",
      "how_it_works": [
        "The metropolitan area initiates the plan; the document addresses transport, networks, services, housing, environment, heritage and resilience in an integrated way.",
        "Each member local council votes on the plan. The PUGZM first enters into force after approval by the polarising local authority and at least half plus one of the member local authorities.",
        "For every other local authority, effects arise only after its own approval. Where approved, the PUGZM replaces the previous general plan; participating authorities no longer need individual general plans."
      ],
      "who_it_affects": [
        {
          "label": "Residents and commuters",
          "text": "Housing, transport and service decisions may be coordinated beyond the administrative boundary of one locality."
        },
        {
          "label": "Owners and developers",
          "text": "The applicable regulation may come from the PUGZM, but only after approval for the local authority where the land is located."
        },
        {
          "label": "Local authorities",
          "text": "Participation does not automatically transfer all powers to the metropolitan area; each local council retains the vote required by the Code."
        }
      ],
      "not_automatic": [
        "Not every metropolitan area is required to prepare a PUGZM.",
        "Approval by the central city does not instantly bind every member commune.",
        "A PUGZM is not an administrative merger and does not remove every sectoral statute or approval."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "art. 39–40; Official Gazette pp. 11–12",
          "role": "operative_text"
        },
        {
          "source_id": "law246-2022",
          "article": "metropolitan-area framework",
          "role": "current_law"
        }
      ],
      "source_refs": [
        "code",
        "law246-2022"
      ],
      "aliases": [
        "metropolitan general plan",
        "PUGZM",
        "metropolitan area",
        "metropolitan plan",
        "Cluj metropolitan",
        "Iași metropolitan",
        "Timișoara metropolitan"
      ],
      "tags": [
        "PUGZM",
        "metropolitan",
        "planning"
      ],
      "related_targets": [
        {
          "target": "#guide-cum-se-poate-schimba-un-cartier",
          "label": "How a neighbourhood can change"
        }
      ],
      "last_verified": "2026-08-05"
    },
    {
      "id": "mechanism-proximity",
      "kind": "mechanism",
      "target": "#mechanism-proximity",
      "number": "02",
      "kicker": "Development and public capacity",
      "title": "Transport and services enter the logic of planning development",
      "reader_question": "Can new areas still be planned without nearby transport, schools and services?",
      "summary": "The general plan must be supported by studies on transport, networks and public facilities, while functional-zone rules must pursue easy access to public transport and public-interest functions.",
      "status_key": "future_code",
      "status_label": "Code mechanism, not yet in force",
      "how_it_works": [
        "The public-transport infrastructure study supports planning rules that relate proposed investment to public-transport capacity and road safety.",
        "The general plan also includes studies on utility networks and the public facilities or services required by development.",
        "Local rules for functional zones must provide easy access to public transport and principal public-interest functions, as well as minimum distances between residential parcels and parcels carrying such functions."
      ],
      "who_it_affects": [
        {
          "label": "Residents and neighbours",
          "text": "The planning document should explain more clearly how transport, utilities and services support development."
        },
        {
          "label": "Developers",
          "text": "Public-infrastructure capacity becomes an explicit basis for regulation, rather than a problem left until the end of a project."
        },
        {
          "label": "Authorities",
          "text": "The general plan and local regulations must convert studies into verifiable rules, not merely general objectives."
        }
      ],
      "not_automatic": [
        "The Code does not set a universal numerical distance to a school, park or stop.",
        "The text does not automatically prohibit every project in an underserved area.",
        "“15-minute city” is a policy or planning interpretation, not the legal name of the mechanism."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "art. 55–56; art. 79; Official Gazette pp. 16–17, 24",
          "role": "operative_text"
        }
      ],
      "source_refs": [
        "code"
      ],
      "aliases": [
        "15-minute city",
        "proximity",
        "public transport",
        "school nearby",
        "public services",
        "public facilities",
        "transport capacity",
        "utilities"
      ],
      "tags": [
        "proximity",
        "transport",
        "services"
      ],
      "related_targets": [
        {
          "target": "#guide-cum-se-poate-schimba-un-cartier",
          "label": "How a neighbourhood can change"
        }
      ],
      "last_verified": "2026-08-05"
    },
    {
      "id": "mechanism-digital-system",
      "kind": "mechanism",
      "target": "#mechanism-digital-system",
      "number": "03",
      "kicker": "National infrastructure",
      "title": "Observatory, platform, geoportal and one-stop shop",
      "reader_question": "Where will I be able to check the parcel and file documents?",
      "summary": "The Code describes a national system in four layers: the National Territorial Observatory, the planning and permitting platform, the public geoportal and the procedural one-stop shop.",
      "status_key": "future_code",
      "status_label": "Future legal architecture, phased implementation",
      "how_it_works": [
        "The Observatory is the interactive analysis and monitoring application, comprising the territorial-dynamics system and the national planning and permitting platform.",
        "The platform integrates approved planning documents and consists of the geoportal and national one-stop shop.",
        "The geoportal is the public-search layer: parcels, data layers and planning documents, with differentiated access and exclusions for classified information.",
        "The one-stop shop is the procedural layer: filings, documents, clarifications, consultation and issue of acts. Article 139 phases operationalisation over five years from publication; publication on 10 August 2026 fixes 10 August 2031 as the mandatory-use date."
      ],
      "who_it_affects": [
        {
          "label": "Citizens and owners",
          "text": "The promise is to locate the parcel, inspect regulation and follow procedures in a coherent system."
        },
        {
          "label": "Professionals",
          "text": "Access and workflows should reduce repeated transmission of the same data, but technical rules and interoperability will be decisive."
        },
        {
          "label": "Authorities and consultees",
          "text": "Use of the one-stop shop becomes mandatory when the five-year period from publication expires, on 10 August 2031, not at commencement on 25 August 2026."
        }
      ],
      "not_automatic": [
        "The current Territorial Observatory does not prove that the whole system in Articles 136–139 is operational.",
        "A portal displaying maps is not automatically also a one-stop shop for every opinion and permit.",
        "The Code does not make the platform mandatory before the implementation stages and deadline."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "art. 136–139; Official Gazette pp. 44–46",
          "role": "operative_text"
        },
        {
          "source_id": "observator-teritorial",
          "article": "existing public service",
          "role": "implementation_evidence"
        },
        {
          "source_id": "observator-pug-map",
          "article": "existing public tool for consulting general plans",
          "role": "implementation_evidence"
        },
        {
          "source_id": "mdlpa-digital-program",
          "article": "digital-transformation programme timetable",
          "role": "implementation_evidence"
        }
      ],
      "source_refs": [
        "code",
        "observator-teritorial",
        "observator-pug-map",
        "mdlpa-digital-program"
      ],
      "aliases": [
        "geoportal",
        "observatory",
        "National Territorial Observatory",
        "one-stop shop",
        "planning platform",
        "online filing",
        "general plan map",
        "parcel online"
      ],
      "tags": [
        "digitalisation",
        "geoportal",
        "one-stop shop"
      ],
      "related_targets": [
        {
          "target": "#guide-ce-devine-digital",
          "label": "What works now and what remains a promise"
        }
      ],
      "last_verified": "2026-08-12"
    },
    {
      "id": "mechanism-parcel-reconfiguration",
      "kind": "mechanism",
      "target": "#mechanism-parcel-reconfiguration",
      "number": "04",
      "kicker": "The geometry of ownership",
      "title": "Land-parcel reconfiguration",
      "reader_question": "Can parcel boundaries be changed in a larger operation?",
      "summary": "The Code separates ordinary subdivision from parcel reconfiguration: a merger followed by subdivision, used for coherent development of an area.",
      "status_key": "future_code",
      "status_label": "Published mechanism, commencing 25 August 2026",
      "how_it_works": [
        "Reconfiguration may include built or unbuilt land, inside or outside the built-up area. The first operation is merger, followed by subdivision of the resulting configuration.",
        "The initiative may come from the local authority or owners. As a rule, the operation requires a prior zonal plan.",
        "For a single operation producing no more than 12 plots, the Code permits a detailed plan where existing rules establish the use, plot characteristics and planning indicators.",
        "The published Official Gazette text corrected the internal cross-reference: Article 223 refers to Article 219, which sets the conditions applicable to subdivisions."
      ],
      "who_it_affects": [
        {
          "label": "Owners",
          "text": "Boundaries and plot distribution may be redrawn in a joint operation, but the mechanism alone does not give an authority power to take an owner’s land."
        },
        {
          "label": "Neighbours",
          "text": "A new parcel geometry may change access, frontages, infrastructure and the kind of development in the area."
        },
        {
          "label": "Authorities and initiators",
          "text": "Coherent development must be demonstrated and the required planning document completed before cadastral operations."
        }
      ],
      "not_automatic": [
        "Reconfiguration is not the same as expropriation.",
        "The exception for up to 12 plots does not remove the detailed plan and listed planning conditions."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "art. 216–223; Official Gazette pp. 63–64",
          "role": "operative_text"
        }
      ],
      "source_refs": [
        "code"
      ],
      "aliases": [
        "parcel reconfiguration",
        "land parcel",
        "change land boundary",
        "merger subdivision",
        "12 plots",
        "subdivision zonal plan",
        "subdivision detailed plan"
      ],
      "tags": [
        "parcels",
        "cadastre",
        "zonal plan"
      ],
      "related_targets": [
        {
          "target": "#guide-cum-se-poate-schimba-un-cartier",
          "label": "How a neighbourhood can change"
        }
      ],
      "last_verified": "2026-08-12"
    },
    {
      "id": "mechanism-regeneration",
      "kind": "mechanism",
      "target": "#mechanism-regeneration",
      "number": "05",
      "kicker": "Integrated operation",
      "title": "Urban regeneration",
      "reader_question": "What does “regeneration” of a neighbourhood mean in law?",
      "summary": "Regeneration becomes an integrated planning operation with a declared area, local programme, special zonal plan and action plan — not a loose label for isolated works.",
      "status_key": "future_code",
      "status_label": "Code mechanism, not yet in force",
      "how_it_works": [
        "The local authority delimits and declares the regeneration area. Interventions may address buildings, shared and public space, green areas, heritage, transport, networks, accessibility and services.",
        "A local regeneration programme is prepared for each area. The operation may proceed only on the basis of a regeneration zonal plan whose action plan is an integral part.",
        "The zonal plan may be initiated by the authority or interested private persons; private initiation entails negotiation of an urban-development contract. Permitting in the area follows approval of the zonal plan."
      ],
      "who_it_affects": [
        {
          "label": "Residents and neighbours",
          "text": "Change may combine public space, infrastructure and buildings, not merely renovate a façade."
        },
        {
          "label": "Owners",
          "text": "The programme and zonal plan may change regulation and include parcel reconfiguration; consultation stages and the action plan matter."
        },
        {
          "label": "Investors and local authorities",
          "text": "Private projects are tied to the public framework for the area and, where applicable, obligations negotiated in the urban-development contract."
        }
      ],
      "not_automatic": [
        "Declaring an area is not a building permit.",
        "Regeneration does not automatically mean demolition or expropriation.",
        "A standalone improvement or rehabilitation work does not become a Code regeneration operation merely by being labelled as such."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "Arts 224–228; Official Gazette pp. 64–65",
          "role": "operative_text"
        }
      ],
      "source_refs": [
        "code"
      ],
      "aliases": [
        "urban regeneration",
        "neighbourhood regeneration",
        "neighbourhood renovation",
        "regeneration zonal plan",
        "local regeneration programme",
        "public space"
      ],
      "tags": [
        "regeneration",
        "zonal plan",
        "neighbourhood"
      ],
      "related_targets": [
        {
          "target": "#guide-cum-se-poate-schimba-un-cartier",
          "label": "Guide for owners and neighbours"
        }
      ],
      "last_verified": "2026-08-05"
    },
    {
      "id": "mechanism-restructuring",
      "kind": "mechanism",
      "target": "#mechanism-restructuring",
      "number": "06",
      "kicker": "Transforming an urban fabric",
      "title": "Urban restructuring",
      "reader_question": "How may an industrial area or an entire urban fabric be transformed?",
      "summary": "Restructuring is a public-interest operation initiated only by the local authority, with a feasibility study, programme, consultation, participant consent, zonal plan and action plan.",
      "status_key": "future_code",
      "status_label": "Code mechanism with sensitive property effects",
      "how_it_works": [
        "The area must be identified in the integrated local-development strategy and/or general plan. Only the local authority may initiate the operation.",
        "The Code requires information and consultation at every stage. Owner participation rests on prior consent and individual information about rights and obligations.",
        "The feasibility study and programme describe the project, financing, cadastral procedure, agreements, costs and any expropriation corridor. The operation proceeds only through a restructuring zonal plan and action plan.",
        "The zonal plan may set the share of land contributed by participants for public-interest objectives and the way resulting properties are redistributed."
      ],
      "who_it_affects": [
        {
          "label": "Participating owners",
          "text": "The agreement and zonal plan may change the shape and distribution of property; rights and obligations must be communicated individually."
        },
        {
          "label": "Owners who do not consent",
          "text": "The Code does not automatically make them participants. Expropriation is possible only if the separate conditions and procedure of Law 255/2010 are met."
        },
        {
          "label": "The community and neighbours",
          "text": "The operation may remake routes, public spaces, uses and infrastructure across the whole area."
        }
      ],
      "not_automatic": [
        "Including land in a restructuring area does not itself transfer ownership.",
        "Public consultation is not the same as an individual veto over the zonal plan.",
        "Expropriation is not an automatic effect of the Code: it requires public utility, indicators and the special-law procedure.",
        "The sequence listed in Article 231 must be read with the detailed provisions; the site does not editorially repair any ordering ambiguity."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "Arts 206–207; arts 229–238; Official Gazette pp. 62, 65–67",
          "role": "operative_text"
        },
        {
          "source_id": "law52-2003",
          "article": "decisional transparency referenced by Article 232",
          "role": "current_law"
        },
        {
          "source_id": "law255-2010",
          "article": "separate expropriation procedure",
          "role": "current_law"
        }
      ],
      "source_refs": [
        "code",
        "law52-2003",
        "law255-2010"
      ],
      "aliases": [
        "urban restructuring",
        "industrial area",
        "restructuring zonal plan",
        "restructuring expropriation",
        "owner consent",
        "land redistribution",
        "land contribution"
      ],
      "tags": [
        "restructuring",
        "expropriation",
        "zonal plan"
      ],
      "related_targets": [
        {
          "target": "#guide-cum-se-poate-schimba-un-cartier",
          "label": "Guide for owners and neighbours"
        }
      ],
      "last_verified": "2026-08-05"
    },
    {
      "id": "mechanism-informal-settlements",
      "number": "07",
      "kind": "mechanism",
      "target": "#mechanism-informal-settlements",
      "kicker": "Precarious housing and regularisation",
      "title": "Informal settlements",
      "reader_question": "What must the authorities do when a community lives without title, infrastructure or safe conditions?",
      "status_key": "mixed_current_future",
      "status_label": "A framework already exists; the Code consolidates it",
      "summary": "The Code retains and develops a mechanism already introduced into Law 350/2001: identification, county commissions, local working groups, community consultation and an action plan that may pursue in-situ regularisation or relocation.",
      "how_it_works": [
        "The settlement is identified through cumulative criteria concerning informally developed dwellings, lack of rights over the property and social vulnerability.",
        "The county council or Bucharest General Council organises a coordination commission; a local working group gathers data, consults the community and proposes measures.",
        "The local authority approves an action plan. The solution may combine infrastructure, housing, cadastre, planning, health, education and social assistance.",
        "Intervention may pursue in-situ regulation and improvement or relocation, depending on risk, land status and the community’s options."
      ],
      "who_it_affects": [
        {
          "label": "Community residents",
          "text": "They must be consulted and included in data collection and the choice of solutions; labelling the area does not automatically create property title."
        },
        {
          "label": "Local and county authorities",
          "text": "They have identification, coordination, planning and monitoring duties spanning planning, cadastre and social services."
        },
        {
          "label": "Landowners and neighbours",
          "text": "Regularisation, infrastructure or relocation may require separate property and planning procedures."
        }
      ],
      "not_automatic": [
        "The Code does not invent informal-settlement policy from scratch: rules, data collection, an official map and an investment programme already exist.",
        "Identification does not automatically legalise buildings, land occupation or utility connections.",
        "Relocation is not the default solution; it must be justified by risk, inability to regularise and community consultation.",
        "A planning document does not replace social, cadastral, health and infrastructure measures."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "Arts 127 and 150–154; Official Gazette p. 40",
          "role": "operative_text"
        },
        {
          "source_id": "informal-settlements-order",
          "article": "Order no. 3,494/2020",
          "role": "current_law"
        },
        {
          "source_id": "informal-settlements-program",
          "article": "2025–2028 programme",
          "role": "implementation_evidence"
        }
      ],
      "source_refs": [
        "code",
        "informal-settlements-order",
        "informal-settlements-map",
        "informal-settlements-program"
      ],
      "aliases": [
        "informal settlement",
        "homes without title",
        "marginalised community",
        "settlement regularisation",
        "community relocation",
        "informal settlement data sheet"
      ],
      "tags": [
        "housing",
        "informal settlements",
        "regularisation"
      ],
      "related_targets": [
        {
          "label": "Track real implementation",
          "target": "#tracker-informal-settlements"
        }
      ],
      "last_verified": "2026-08-05"
    },
    {
      "id": "mechanism-action-zones",
      "number": "08",
      "kind": "mechanism",
      "target": "#mechanism-action-zones",
      "kicker": "The geography of public intervention",
      "title": "Urban and rural action zones",
      "reader_question": "How can a territory be delimited so that the authority coordinates several operations?",
      "status_key": "future_code",
      "status_label": "A Code instrument activated through planning documents",
      "summary": "An action zone is a delimitation through which planning may bring regeneration, restructuring, urbanisation, de-urbanisation, public projects and ecological reconstruction into one territorial framework.",
      "how_it_works": [
        "The zone is identified and delimited through territorial or urban planning documents, not by a simple administrative announcement.",
        "The document must explain the problem, public interest, intended operations, actors, stages and relationship with property and investment in the area.",
        "Different mechanisms may be coordinated inside it — regeneration, restructuring, public projects or ecological reconstruction — each with its own conditions.",
        "Rules may introduce planning limits and prohibitions justified by the public-interest operation, subject to the procedure for the document that establishes them."
      ],
      "who_it_affects": [
        {
          "label": "Owners and investors",
          "text": "Rules, phasing and duties may differ from the rest of the locality, but only through the applicable acts and procedures."
        },
        {
          "label": "Residents and communities",
          "text": "Delimitation may concentrate investment and services, but may also place pressure on housing, activities or property values."
        },
        {
          "label": "The local authority",
          "text": "It must connect strategy, planning, finance, public projects and implementation, not merely draw a boundary on a map."
        }
      ],
      "not_automatic": [
        "Delimitation does not transfer ownership or automatically authorise works.",
        "The “action zone” label does not replace a zonal plan, authorisation, consultation or required property procedures.",
        "Not every listed operation becomes mandatory in every zone.",
        "Public interest must be demonstrated in the planning document; using the Code’s label is not enough."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "Arts 183–184; Official Gazette p. 57",
          "role": "operative_text"
        }
      ],
      "source_refs": [
        "code",
        "committee-report"
      ],
      "aliases": [
        "urban action zone",
        "rural action zone",
        "regeneration zone",
        "restructuring zone",
        "territorial operation",
        "intervention boundary"
      ],
      "tags": [
        "action zone",
        "regeneration",
        "public interest"
      ],
      "related_targets": [
        {
          "label": "How a neighbourhood can change",
          "target": "#guide-cum-se-poate-schimba-un-cartier"
        }
      ],
      "last_verified": "2026-08-05"
    },
    {
      "id": "mechanism-coast-300m",
      "number": "09",
      "kind": "mechanism",
      "target": "#mechanism-coast-300m",
      "kicker": "A temporary coastal rule",
      "title": "The 300-metre coastal prohibition",
      "reader_question": "What does the 300 m rule mean, and when does the temporary prohibition cease to operate?",
      "status_key": "future_code_special_law",
      "status_label": "Code rule + continuing special statutes",
      "summary": "Article 200 creates a temporary construction prohibition in a defined coastal area until it is delimited and regulated through planning documents; approval of the document does not displace other coastal, water and environmental law.",
      "how_it_works": [
        "The area described by the text extends landward up to 300 m from the sea boundary and seaward to the 2 m isobath, subject to the article’s wording.",
        "Local authorities must initiate the documents within one year of commencement and approve them within no more than five years.",
        "Until delimitation and regulation, the temporary prohibition operates subject to Article 200 and its exceptions.",
        "After approval, any project remains subject to planning rules and special law on beaches, water, the environment and protected areas."
      ],
      "who_it_affects": [
        {
          "label": "Owners and developers",
          "text": "Land within 300 m does not become buildable merely because a general or zonal plan exists; the exact rule and every special regime must be checked."
        },
        {
          "label": "Coastal local authorities",
          "text": "They have deadlines to initiate and approve the documents and must delimit the area using cadastral, hydrographic and environmental data."
        },
        {
          "label": "The public and civic groups",
          "text": "The delimitation document is the point at which proposed rules and effects on access, beaches and landscape become visible."
        }
      ],
      "not_automatic": [
        "The rule cannot be reduced to an absolute and permanent ban on every construction within 300 m.",
        "A zonal plan is not the only condition and does not implicitly derogate from special statutes.",
        "The text does not validate existing construction or resolve previous permits and disputes.",
        "Publication on 10 August 2026 fixes commencement on 25 August: the one-year deadline falls on 25 August 2027 and the five-year maximum on 25 August 2031."
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "Art. 200; Official Gazette p. 61",
          "role": "operative_text"
        },
        {
          "source_id": "water-law",
          "article": "Water Law no. 107/1996",
          "role": "current_law"
        },
        {
          "source_id": "oug195-2005",
          "article": "Emergency Ordinance no. 195/2005",
          "role": "current_law"
        }
      ],
      "source_refs": [
        "code",
        "water-law",
        "oug195-2005"
      ],
      "aliases": [
        "300 metre coast",
        "coastal construction ban",
        "building on beaches",
        "2 metre isobath",
        "land by the sea",
        "coastal zonal plan"
      ],
      "tags": [
        "coast",
        "beaches",
        "300 metres"
      ],
      "related_targets": [
        {
          "label": "Full guide to beaches and green space",
          "target": "#spatii-verzi-plaje-supraetajari"
        },
        {
          "label": "Track planning deadlines",
          "target": "#tracker-coastal-plans"
        }
      ],
      "last_verified": "2026-08-12"
    }
  ],
  "guides": [
    {
      "id": "guide-digital-promises",
      "kind": "guide",
      "target": "#guide-ce-devine-digital",
      "kicker": "Implementation guide",
      "title": "What becomes digital — and what does not work yet",
      "dek": "The Code describes a coherent national infrastructure, but legal existence, an accessible website and a complete operational procedure are three different things.",
      "status_key": "mixed",
      "status_label": "Existing tools + future system",
      "summary": "The Territorial Observatory and some public tools already exist. I could not verify that the integrated platform, geoportal and one-stop shop described by Articles 136–139 currently operate as one complete national workflow.",
      "blocks": [
        {
          "type": "status_table",
          "title": "What exists and what the Code promises",
          "rows": [
            {
              "item": "Territorial Observatory",
              "legal": "Already exists as a public data and analysis service.",
              "operational": "Publicly accessible; it should not be confused with every future Code component.",
              "status": "existent_partial"
            },
            {
              "item": "Public general-plan consultation map",
              "legal": "An existing tool in the Observatory ecosystem.",
              "operational": "Useful for consultation, but does not prove integration of every planning document or national procedure.",
              "status": "existent_partial"
            },
            {
              "item": "National planning and permitting platform",
              "legal": "Defined by Articles 136–137.",
              "operational": "The site does not treat it as a fully operational national system without separate official evidence.",
              "status": "future_unverified"
            },
            {
              "item": "Geoportal",
              "legal": "Article 138 promises parcel, layer and planning-document search and downloads, with differentiated access.",
              "operational": "The complete Code function remains to be verified as implementation proceeds.",
              "status": "future_unverified"
            },
            {
              "item": "National one-stop shop",
              "legal": "Article 139 covers filings, clarifications, consultation and issue of acts.",
              "operational": "We do not assume that every filing can already be made through one national workflow.",
              "status": "future_unverified"
            }
          ]
        },
        {
          "type": "timeline",
          "title": "Legal timetable",
          "items": [
            "The Code provides for phased operationalisation within five years of publication.",
            "After that period, use of the platform becomes mandatory for authorities and issuers of opinions and approvals.",
            "Until the digital duties apply, existing procedures and systems continue to be used."
          ]
        },
        {
          "type": "reader_checklist",
          "title": "How to verify a digital promise",
          "items": [
            "Find an official page naming the exact component, responsible institution and geographic coverage.",
            "Check whether the service only displays data or also permits filing, clarification, payment, consultation and issue of the act.",
            "Do not confuse a pilot, map or local portal with nationwide availability.",
            "Keep proof of the channel and date used for an official filing."
          ]
        },
        {
          "type": "limitation",
          "title": "What we do not claim",
          "items": [
            "We do not say the complete system works merely because the Observatory is online.",
            "We do not say nothing digital exists: real tools exist, but they may be fragmented or narrower in function.",
            "The status of each component is followed, with evidence and a date, in the implementation section."
          ]
        }
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "art. 136–139; Official Gazette pp. 44–46",
          "role": "operative_text"
        },
        {
          "source_id": "observator-teritorial",
          "article": "existing public service",
          "role": "implementation_evidence"
        },
        {
          "source_id": "observator-pug-map",
          "article": "existing public map",
          "role": "implementation_evidence"
        },
        {
          "source_id": "mdlpa-digital-program",
          "article": "digitalisation programme and targets",
          "role": "implementation_evidence"
        }
      ],
      "source_refs": [
        "code",
        "observator-teritorial",
        "observator-pug-map",
        "mdlpa-digital-program"
      ],
      "aliases": [
        "what becomes digital",
        "what works now",
        "planning platform",
        "working geoportal",
        "online one-stop shop",
        "digital filing",
        "digitalisation programme"
      ],
      "tags": [
        "digitalisation",
        "implementation",
        "platform"
      ],
      "related_targets": [
        {
          "label": "Follow implementation status",
          "target": "#implementation-tracker"
        },
        {
          "target": "#mechanism-digital-system",
          "label": "The legal mechanism in Articles 136–139"
        },
        {
          "target": "#guide-ce-se-construieste-langa-mine",
          "label": "What information should be published about a project"
        }
      ],
      "last_verified": "2026-08-05"
    },
    {
      "id": "guide-changing-neighbourhood",
      "kind": "guide",
      "target": "#guide-cum-se-poate-schimba-un-cartier",
      "kicker": "Guide for owners and neighbours",
      "title": "How a neighbourhood can change",
      "dek": "“Regeneration is coming” may conceal very different legal processes. First identify the mechanism, the document that starts it and its current stage.",
      "status_key": "future_code",
      "status_label": "Guide to future Code mechanisms",
      "summary": "A neighbourhood may change through ordinary regulation, an action zone, parcel reconfiguration, regeneration or restructuring. The owner’s and neighbour’s positions differ between routes.",
      "blocks": [
        {
          "type": "routes",
          "title": "Five routes that should not be confused",
          "routes": [
            {
              "name": "Ordinary general/zonal plan",
              "target": "#deep-dive",
              "text": "Changes planning regulation but is not by itself an integrated transformation programme for the area."
            },
            {
              "name": "Action zone",
              "target": "#mechanism-action-zones",
              "text": "Article 183 may delimit territory for regeneration, restructuring, urbanisation/de-urbanisation, public projects or ecological reconstruction."
            },
            {
              "name": "Parcel reconfiguration",
              "target": "#mechanism-parcel-reconfiguration",
              "text": "Redraws plot boundaries through cadastral operations linked to a planning document."
            },
            {
              "name": "Urban regeneration",
              "target": "#mechanism-regeneration",
              "text": "Coordinates buildings, public space, infrastructure and services through a local programme, zonal plan and action plan."
            },
            {
              "name": "Urban restructuring",
              "target": "#mechanism-restructuring",
              "text": "Deeply transforms an urban fabric and may involve property redistribution or, separately and conditionally, expropriation."
            }
          ]
        },
        {
          "type": "process",
          "title": "Questions that establish the stage",
          "items": [
            "Was the area merely mentioned in a strategy/general plan, or delimited and declared by an act?",
            "Is there an approved study, programme, zonal plan and action plan, or only a political intention?",
            "Who initiated it: the authority, a private party or owners?",
            "What has been published and at what stage is consultation taking place?",
            "Has the owner been asked for consent or notified of a separate expropriation procedure?"
          ]
        },
        {
          "type": "owner_neighbour",
          "title": "The owner and neighbour do not occupy the same position",
          "items": [
            "An owner inside the perimeter should track effects on regulation, the parcel, contributions to public objectives, agreements and any expropriation.",
            "A neighbour outside it should track access, traffic, height, uses, infrastructure, environment and the consultation stage.",
            "Consultation gives a right to know and comment; it does not guarantee acceptance and is not a veto."
          ]
        },
        {
          "type": "safety",
          "title": "Expropriation does not arise from the area’s label alone",
          "items": [
            "Reconfiguration and regeneration do not automatically transfer ownership.",
            "In restructuring, participation rests on prior consent. For owners who do not consent, expropriation may proceed only through the separate Law 255/2010 procedure and public-utility conditions.",
            "An approved zonal plan and an expropriation decision are different acts with different legal bases and routes of challenge."
          ]
        },
        {
          "type": "reader_checklist",
          "title": "The minimum file to look for",
          "items": [
            "The decision or planning document delimiting the area.",
            "The strategy/general plan that justifies it.",
            "The feasibility study or local programme, depending on the mechanism.",
            "The zonal plan, regulations and action plan.",
            "The public-consultation report and approval decision.",
            "The cadastral plan, individual agreement or expropriation acts, if relevant."
          ]
        }
      ],
      "legal_basis": [
        {
          "source_id": "code",
          "article": "Art. 183; arts 206–238; Official Gazette pp. 57, 62–67",
          "role": "operative_text"
        },
        {
          "source_id": "law52-2003",
          "article": "decisional transparency",
          "role": "current_law"
        },
        {
          "source_id": "law255-2010",
          "article": "separate expropriation procedure",
          "role": "current_law"
        }
      ],
      "source_refs": [
        "code",
        "law52-2003",
        "law255-2010"
      ],
      "aliases": [
        "how neighbourhood changes",
        "what happens to neighbourhood",
        "action zone",
        "neighbourhood regeneration",
        "neighbourhood restructuring",
        "owner expropriation",
        "zonal plan consultation"
      ],
      "tags": [
        "neighbourhood",
        "owners",
        "neighbours"
      ],
      "related_targets": [
        {
          "target": "#mechanism-parcel-reconfiguration",
          "label": "Land-parcel reconfiguration"
        },
        {
          "target": "#mechanism-regeneration",
          "label": "Urban regeneration"
        },
        {
          "target": "#mechanism-restructuring",
          "label": "Urban restructuring"
        },
        {
          "target": "#guide-ce-se-construieste-langa-mine",
          "label": "What is being built next to me?"
        }
      ],
      "last_verified": "2026-08-05"
    }
  ]
}
