# The test train across the Prut

## Fălciu, at the end of the line

From Fălciu station, the railway runs toward the bridge over the Prut and Cantemir station. A train crossed the border here for a test in April 2026. Follow the locomotive through a schematic diagram of the crossing. [1]

## The line inland

A test crossing over the bridge does not tell you whether you can take a train from here. CFR’s network reference dated 15 October 2026 lists the Zorleni–Fălciu section as permanently closed. For a freight train, CFR says it can be opened when needed, with at least 30 days’ advance notice. [2]

## An agreement for border controls

The agreement signed in Bucharest establishes coordinated border controls in both directions, on Romanian territory. It concerns the Fălciu–Cantemir railway crossing. It defines how border authorities work together; by itself, it does not establish passenger train service. [3]

## The agreement becomes law

Romania’s Parliament ratified the agreement through Law no. 134 of 13 July 2026. The law concerns a railway border crossing and coordinated controls on Romanian territory. It provides a legal framework for the crossing, not a passenger timetable. [4]

## The locomotive crosses

Public broadcaster Teleradio Moldova reported that a locomotive crossed the bridge toward Fălciu in a technical test, after a break of over 30 years. The report shows the crossing; it does not present it as a return to regular train service. [1]

## A crossed bridge, a closed line

Fălciu has a railway border point with a ratified control agreement and a recorded test crossing. In the same 2026 document, CFR lists the Zorleni–Fălciu section as permanently closed. Together, these facts describe a tested and regulated border link, without evidence of regular passenger trains. [1][2][4]

## Sources

1. [Teleradio Moldova, “The train crossed the Prut River towards Fălciu, after a break of over 30 years”](https://www.youtube.com/watch?v=XCHuFuX9WPw) Report and video of the 22 April 2026 test crossing on the Cantemir–Fălciu route.
2. [CFR SA, 2026 Network Reference Document, Annex 11](https://cfr.ro/files/ddr/RO%202026/Anexa%2011%20.pdf) Update dated 15 October 2026; lists the Zorleni–Fălciu section as permanently closed and explains the advance notice for freight access.
3. [Romanian Ministry of Internal Affairs, “Signing of the Agreement…”](https://www.mai.gov.ro/en/signing-of-the-agreement-between-the-government-of-romania-and-the-government-of-the-republic-of-moldova-regarding-the-coordinated-control-at-the-railway-crossing-point-of-the-falciu-cantemir/) The agreement signed on 1 October 2025 for coordinated controls at the Fălciu–Cantemir railway crossing.
4. [Romanian Chamber of Deputies, Law no. 134/2026](https://www.cdep.ro/ords/pls/legis/legis_pck.htp_act?an=2026&nr=134) Romanian law ratifying the bilateral coordinated-control agreement.
