Lugoj · Timiș County · 1902
One crossing.
Four customs houses.
Goods moving between Romanian Lugoj and German Lugoj crossed the Timiș River here. Four buildings beside the bridge were used for customs checks. The Iron Bridge that stands today opened in August 1902.
Why four? ↓
The year before
First, the wooden bridge was removed.
The old wooden bridge was demolished a year before the iron bridge opened. In August 1902, Lugoj opened a new crossing over the Timiș. The model shifts between the two moments; the sources do not provide a plan of the wooden bridge's form.
Source: Lugoj's 2021–2027 sustainable development strategy.
Designed in Budapest · made in Reșița
More than 185 tonnes of components came from Reșița.
The design was carried out by Mandel (Julius), Hoffmann (Sándor) & Quittner (Vilmos), a Budapest firm. The bridge components weighed more than 185 tonnes and were made at the Reșița Works. The beams light in sequence on screen; that reveal explains the structure and is not a documented construction timeline.
Source: Lugoj's 2025 cultural and historical catalogue.
Beside the crossing · Romanian and German Lugoj
Four buildings marked the passage of goods.
The buildings flanking the bridge were used to clear goods moving between German Lugoj and Romanian Lugoj. The city guide records their role, but does not provide a plan locating each building. In this model, four structures sit schematically at the approaches; their positions are not exact.
Source: Lugoj's 2025 cultural and historical catalogue.
The Iron Bridge · a landmark in Lugoj
The bridge stayed at the heart of Lugoj.
The bridge connects the riverbanks, and its story keeps the names of the two Lugoj communities it served: Romanian Lugoj and German Lugoj. In a photograph from 2006, the structure is seen from the riverbank. Below, you can turn it and inspect it from four angles.
The 3D scene shows a schematic bridge and four buildings. Dimensions, building positions and the water level are illustrative.