mariuscomper.uk Română
LUGOJ · TODAYacross the Timiș
The Iron Bridge crosses the Timiș River, photographed in 2006.

The bridge opened in August 1902. Its components, weighing more than 185 tonnes, were made in Reșița.

Lugoj · Timiș County · 1902

One crossing.
Four customs houses.

Goods moving between Romanian Lugoj and German Lugoj crossed the Timiș River here. Four buildings beside the bridge were used for customs checks. The Iron Bridge that stands today opened in August 1902.

Why four?

The year before

First, the wooden bridge was removed.

The old wooden bridge was demolished a year before the iron bridge opened. In August 1902, Lugoj opened a new crossing over the Timiș. The model shifts between the two moments; the sources do not provide a plan of the wooden bridge's form.

Source: Lugoj's 2021–2027 sustainable development strategy.

Designed in Budapest · made in Reșița

More than 185 tonnes of components came from Reșița.

The design was carried out by Mandel (Julius), Hoffmann (Sándor) & Quittner (Vilmos), a Budapest firm. The bridge components weighed more than 185 tonnes and were made at the Reșița Works. The beams light in sequence on screen; that reveal explains the structure and is not a documented construction timeline.

Source: Lugoj's 2025 cultural and historical catalogue.

Beside the crossing · Romanian and German Lugoj

Four buildings marked the passage of goods.

The buildings flanking the bridge were used to clear goods moving between German Lugoj and Romanian Lugoj. The city guide records their role, but does not provide a plan locating each building. In this model, four structures sit schematically at the approaches; their positions are not exact.

Source: Lugoj's 2025 cultural and historical catalogue.

The Iron Bridge · a landmark in Lugoj

The bridge stayed at the heart of Lugoj.

The bridge connects the riverbanks, and its story keeps the names of the two Lugoj communities it served: Romanian Lugoj and German Lugoj. In a photograph from 2006, the structure is seen from the riverbank. Below, you can turn it and inspect it from four angles.

The 3D scene shows a schematic bridge and four buildings. Dimensions, building positions and the water level are illustrative.

Change your viewpoint

Turn the bridge.

Choose a view along the truss, towards the customs buildings, or from above.

Drag the model to turn it. The buttons also work with a keyboard.

View from the river.

Lugoj · 2006

The bridge seen from its bank.

The Iron Bridge crosses the Timiș River, with buildings of Lugoj visible on the bank. Photographed in 2006.
The Iron Bridge over the Timiș, photographed on 11 August 2006. Photograph: Radu Trifan, public domain, via Wikimedia Commons. The 3D model above is a schematic, not a copy of this photograph.

The record

Sources and limits

  1. Municipality of Lugoj, Cultural and Historical Catalogue, 2025. Records the 1902 opening, the Budapest firm, Reșița-made components, and the customs use of four flanking buildings.
  2. Municipality of Lugoj, Sustainable Development Strategy 2021–2027. Says the wooden bridge was demolished a year before the iron bridge opened.
  3. OpenStreetMap, Iron Bridge, public bridge feature at 45.6838024° N, 21.9039920° E. © OpenStreetMap contributors, ODbL 1.0.
  4. Radu Trifan, Podul de Fier Lugoj, photograph from 2006, released into the public domain.

The more-than-185-tonne figure is the combined weight of the bridge components reported by the city, not an independent measurement of the present structure. The sources cited here provide no water-level measurements or dimensioned bridge plan.