Heat substation 1 Anexa: hours of below-standard hot water, 2025–2026
Sector 3
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 1
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 3 | 1 | 3 | 578 | 222 |
| 2026* | 248 | 22 | 213 | 297 | 26 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-10-22 02:48
Lucrare de modernizare -firma-POIM
• Int Ţiglina - Scoala Gimnaziala Cezar Bolliac • Str Diligenţei - • Str Mircea Bădescu - • Str Nicolae Tudor - • Str Levănţica - • Str Dristorului - • Str Cerceluş -
Streets named in the notices
- Str Cerceluş -
Outages and their causes, on this substation’s page in “Why your hot water is off”