Heat substation 1 Ilie Pintilie: hours of below-standard hot water, 2025–2026
Sector 1
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 18
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 95 | 18 | 61 | 454 | 70 |
| 2026* | 42 | 6 | 0 | 164 | 0 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-10-15 21:26
Remediere avarie circuit primar
• Str Mexic - bl. 1, I3 • Str Londra - bl. 4 • Str Louis Blanc - bl.I 1 • Str Argentina - bl. I2 • Bld Ilie Pintilie - • Bld Iancu de Hunedoara - bl. 2, 3, I1
Streets named in the notices
- Str Mexic
- Str Londra
- Str Louis Blanc
- Str Argentina
- Bld Iancu de Hunedoara