Heat substation 10 Pantelimon: hours of below-standard hot water, 2025–2026
Sector 2
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 23
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 210 | 23 | 98 | 224 | 57 |
| 2026* | 499 | 59 | 285 | 82 | 37 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-09-17 14:55
Lipsa parametri pentru livrare apă caldă de consum
• Str Alexandru Ipsilanti - bl.29Bis, 29E • Str Logofătul Dan - bl.22 • Str Bodeşti - bl.29A, 29B • Şos Pantelimon - bl.3, 4 • Str Armaşul Marcu - bl. 23, 24, 28, 27, 29, 25, 26 • Str Cluceru Sandu - bl.29C
Streets named in the notices
- Str Alexandru Ipsilanti
- Str Logofătul Dan
- Str Bodeşti
- Şos Pantelimon
- Str Armaşul Marcu
- Str Cluceru Sandu
Outages and their causes, on this substation’s page in “Why your hot water is off”