Heat substation 2/7: hours of below-standard hot water, 2025–2026
Sector 6
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 50
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 467 | 50 | 210 | 82 | 177 |
| 2026* | 73 | 29 | 4 | 24 | 18 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-10-04 22:13
Lipsa parametri pentru livrare apă caldă de consum
• Str Peştera Scărişoara - bl. 701A, B16B • Str Paşcani - • Str Drumul Taberei - bl.TS7,TS8, TS10, TS9, 701B, R1, R2, R3 • Str Târgu Neamţ - bl. B16A, MIIB8/2, A15, A16, A17, A18, TS30, TS31, TD 27, TD 28, TD29, MIIB8/1, 715A, 715B • Str Segarcea - bl.A11, A14, A12, A13, B13, B14
Streets named in the notices
- Str Peştera Scărişoara
- Str Drumul Taberei
- Str Târgu Neamţ
- Str Segarcea
Outages and their causes, on this substation’s page in “Why your hot water is off”