Heat substation 3 Cheile Zanoagei: hours of below-standard hot water, 2025–2026

Sector 2

1,575Reconstructed hours with a notice of hot water below standard · in 2025

250 national threshold: 250 hours per year and contract · local threshold: total waiver

Calendar dates with at least one captured notice: 154

The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.

YearHot water below standard, hoursDates with a noticeHeating below standard, hoursHot water off, hoursHeating off, hours
20251,5751541,1051,189184
2026*73480778382168

* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.

Last captured notice (original, in Romanian) · 2026-10-23 03:09

Lipsă parametri pentru livrare apă caldă de consum

• Str Berechet - bl.T31A • Str Inginerilor Tei - bl.T31B, T30C, T30B, T30A • Bld Ghica Tei - bl.T32, T33, • Str Oteşani - Camin C7 (Bl.T29)

Streets named in the notices

Outages and their causes, on this substation’s page in “Why your hot water is off”