Heat substation 3 Sebastian: hours of below-standard hot water, 2025–2026
Sector 5
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 33
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 232 | 33 | 367 | 323 | 0 |
| 2026* | 37 | 10 | 2 | 213 | 61 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-10-03 17:48
Lucrări de modernizare pe rețeaua termică primară. Lucrări POIM, LOT 3, OBIECTIV 13
• Int Aurel Ciurea - bl. S41 • Str Maria Cunţan - bl. S40, S42, S43, S44 • Str Samuil Vulcan - bl. S45
Streets named in the notices
- Int Aurel Ciurea
- Str Maria Cunţan
- Str Samuil Vulcan
Outages and their causes, on this substation’s page in “Why your hot water is off”