Heat substation 3 Turda: hours of below-standard hot water, 2025–2026
Sector 1
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 11
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 45 | 11 | 53 | 227 | 3 |
| 2026* | 17 | 6 | 23 | 52 | 11 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-09-14 10:04
Lipsa parametri pentru livrare apă caldă de consum
• Str Col Ştefan Stoika - bl. 17A, 17B, 19, 20 • Str Chişcani - bl. 18A • Str Iani Buzoianu - bl. 16A, 16, imob.Nr.5, 11-13
Streets named in the notices
- Str Col Ştefan Stoika
- Str Chişcani
- Str Iani Buzoianu
Outages and their causes, on this substation’s page in “Why your hot water is off”