Heat substation 4/7' - Partial: hours of below-standard hot water, 2025–2026
Sector 6
184Reconstructed hours with a notice of hot water below standard · in 2025
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 22
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 184 | 22 | 177 | 45 | 66 |
| 2026* | 12 | 4 | 3 | 39 | 0 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-10-13 10:55
Remediere avarie rețea secundară pe circuitul de apă caldă de consum str. Brasov
• Str Braşov - bl 719 • Str Valea Călugărească - bl. 720
Streets named in the notices
- Str Drumul Taberei
- Str Braşov
- Str Valea Călugărească
- Str Chilia Veche
- Str Valea Roşie
Outages and their causes, on this substation’s page in “Why your hot water is off”