Heat substation 4 Sălaj: hours of below-standard hot water, 2025–2026
Sector 5
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 12
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 54 | 12 | 144 | 306 | 0 |
| 2026* | 28 | 8 | 9 | 174 | 0 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-10-04 00:36
Lucrări de modernizare pe rețeaua termică primară. Lucrări POIM, LOT 3, OBIECTIV 13
• Şos Sălaj - bl. 58A, 126A, 128B • Ale Tulcea - bl. 126B, 128 • Cal Ferentari - bl. 125, 123, 124, 124A, 126
Streets named in the notices
- Şos Sălaj
- Ale Tulcea
- Cal Ferentari
Outages and their causes, on this substation’s page in “Why your hot water is off”