Heat substation 6-1 Mai: hours of below-standard hot water, 2025–2026
Sector 1
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 26
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 97 | 26 | 113 | 106 | 33 |
| 2026* | 5 | 4 | 26 | 88 | 1 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-10-15 12:24
Mentenanță instalație interioară în punctul termic pentru circuit de apa calda de consum
• Str Turda - bl. 39, 37, 34, 35, 36, 38 • Str Gala Galaction - imob.Nr.89, 90, 88 • Str Abrud - bl. 12C • Bld Ion Mihalache - bl. 12A, 13A, 14, 11 • Str Ing. Zablovschi - bl. 12B, 13B, imob.Nr.6A
Streets named in the notices
- Str Turda
- Str Abrud
- Bld Ion Mihalache
- Str Ing. Zablovschi
Outages and their causes, on this substation’s page in “Why your hot water is off”