Heat substation 7/2: hours of below-standard hot water, 2025–2026
Sector 6
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 33
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 171 | 33 | 157 | 21 | 21 |
| 2026* | 48 | 11 | 1 | 22 | 0 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-09-08 11:59
Parametri insuficienti furnizati de CTE Grozavesti
• Ale Poiana Vadului - bl. OD8 • Ale Poiana Cernei - bl. E6, E26,E27 • Bld Timişoara - bl A, B, C, D, E, F, G, H
Streets named in the notices
- Ale Poiana Vadului
- Ale Poiana Cernei
- Bld Timişoara
Outages and their causes, on this substation’s page in “Why your hot water is off”