Heat substation SC 6/2 - MODULE TERMICE - Partial: hours of below-standard hot water, 2025–2026
Sector 6
201Reconstructed hours with a notice of hot water below standard · in 2025
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 29
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 201 | 29 | 210 | 331 | 192 |
| 2026* | 11 | 4 | 0 | 194 | 48 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-09-16 10:48
Remediere avarie în modulul termic pe circuitul de apă caldă de consum
• Ale Bucşeneşti - bl. E11
Streets named in the notices
- Ale Bucşeneşti
- Str Braşov
- Ale Valea Florilor
- Bld Timişoara
Outages and their causes, on this substation’s page in “Why your hot water is off”