Speed restrictions on CFR line 200 Pod Mureș – Coșlariu – Curtici, 2021–2026

CFR line 200 Pod Mureș – Coșlariu – Curtici: 171.3 km of track under speed restrictions in April 2021, 85.4 km in April 2026, of which 1.0 km in every April since 2021.

ȘibotMintiaIlteuBătuțaRadna20212021 · km 437.208–449.508 · 120 km/h · all trains · Ax st. Șibot - Ax st. Orăștie2021 · km 604.918–611.2 · 120 km/h · all trains · St. Ghioroc linia 3 directă și Ghioroc - Glogovăț2021 · km 605.6–611.2 · 120 km/h · all trains · St. Ghioroc linia 2 directă și Ghioroc - Glogovăț2021 · km 402.52–502.57 · 100 km/h · all trains · Coșlariu - Sântimbru2021 · km 449.509–472.424 · 100 km/h · all trains · Ax st. Orăștie - Ax st. Simeria2021 · km 625.65–625.7 · 100 km/h · all trains · Glogovăț - Arad2021 · km 625.65–625.7 · 70 km/h · all trains · Glogovăț - Arad2021 · km 459–459.1 · 50 km/h · all trains · Orăștie - Simeria2021 · km 471.05–471.1 · 30 km/h · all trains · Orăștie - Simeria2021 · km 491.58–491.73 · 30 km/h · all trains · Mintia - Brănișca2021 · km 499.15–500.5 · 30 km/h · all trains · Brănișca - Ilia2021 · km 502.65–505 · 30 km/h · all trains · Brănișca - Ilia și St. Ilia linia 3 directă2021 · km 510.8–517.4 · 30 km/h · all trains · St. Gurasada linia 2 directă și Gurasada - Zam2021 · km 524.3–529.3 · 30 km/h · all trains · Cîmpuri Surduc - Ilteu2021 · km 533.9–536.75 · 30 km/h · all trains · Zam - Ilteu, st. Ilteu linia 2 directă și Ilteu - Săvîrșin2021 · km 540.85–540.95 · 30 km/h · all trains · Ilteu - Săvîrșin2021 · km 544.1–547.8 · 30 km/h · all trains · Ilteu - Săvîrșin linia 3 directă Săvîrșin și Săvîrșin - Vărădia2021 · km 552.35–552.7 · 30 km/h · all trains · St. Vărădia linia 3 directă proiectată Cap X2021 · km 562.52–563.7 · 30 km/h · all trains · St. Bătuța linia 2 directă2021 · km 574.58–574.63 · 30 km/h · all trains · Bârzava Nouă - Conop2021 · km 582.925–582.975 · 30 km/h · all trains · Conop - Milova2021 · km 588.4–588.5 · 30 km/h · all trains · Milova - Radna2021 · km 594.75–594.95 · 30 km/h · all trains · St. Radna linia 3 directă Cap X20222022 · km 437.208–449.508 · 120 km/h · all trains · Ax st. Șibot - Ax st. Orăștie2022 · km 449.509–472.424 · 100 km/h · all trains · Ax st. Orăștie - Ax st. Simeria2022 · km 625.65–625.7 · 100 km/h · all trains · Glogovăț - Arad2022 · km 625.65–625.7 · 100 km/h · all trains · Glogovăț - Arad2022 · km 546.95–547.95 · 50 km/h · all trains · Săvîrșin - Vărădia2022 · km 471.05–471.1 · 30 km/h · all trains · Orăștie - Simeria2022 · km 473.54–473.66 · 30 km/h · all trains · Simeria - Deva2022 · km 490.5–494.05 · 30 km/h · all trains · Mintia - Brănișca2022 · km 496.7–497.7 · 30 km/h · all trains · Brănișca - Ilia2022 · km 510.55–517.4 · 30 km/h · all trains · Ilia - Zam2022 · km 524.3–527.7 · 30 km/h · all trains · Cîmpuri Surduc - Zam și st. Zam linia 2 directă2022 · km 541.5–541.6 · 30 km/h · all trains · St. Săvîrșin linia 3 directă2022 · km 562.52–563.7 · 30 km/h · all trains · St. Bătuța linia 2 directă2022 · km 574.58–574.63 · 30 km/h · all trains · Bârzava Nouă - Conop2022 · km 582.925–582.975 · 30 km/h · all trains · Conop - Milova20232023 · km 449.507–472.424 · 120 km/h · all trains · Ax st. Orăștie - Ax st. Simeria2023 · km 402.52–402.57 · 100 km/h · all trains · Coșlariu - Sântimbru2023 · km 402.52–402.57 · 100 km/h · all trains · Coșlariu - Sântimbru2023 · km 625.65–625.7 · 100 km/h · all trains · Glogovăț - Arad2023 · km 574.35–575.8 · 70 km/h · all trains · Bârzava Nouă - Milova2023 · km 625.65–625.7 · 70 km/h · all trains · Glogovăț - Arad2023 · km 546.95–547.95 · 50 km/h · all trains · Săvîrșin - Vărădia2023 · km 471.05–471.12 · 30 km/h · all trains · St. Simeria linia 4 directă, Cap X2023 · km 490–494.05 · 30 km/h · all trains · Mintia - Brănișca2023 · km 496.7–497.7 · 30 km/h · all trains · Brănișca - Ilia2023 · km 526.2–526.25 · 30 km/h · all trains · Câmpuri Surduc - Zam2023 · km 541.5–541.6 · 30 km/h · all trains · St. Săvîrșin linia 3 directă2023 · km 562.52–563.7 · 30 km/h · all trains · St. Bătuța linia 2 directă20242024 · km 394.45–394.9 · 140 km/h · all trains · Ramificație Sântimbru- Ramificație Podu Mureș2024 · km 394.45–394.9 · 140 km/h · all trains · Ramificație Sântimbru- Ramificație Podu Mureș2024 · km 449.507–472.424 · 120 km/h · all trains · Ax st. Orăștie - Ax st. Simeria2024 · km 625.65–625.7 · 100 km/h · all trains · Glogovăț - Arad2024 · km 625.65–625.7 · 100 km/h · all trains · Glogovăț - Arad2024 · km 459.7–460 · 70 km/h · all trains · Orăștie - Simeria2024 · km 574.35–575.8 · 70 km/h · all trains · Bârzava Nouă - Milova2024 · km 574.35–575.8 · 70 km/h · all trains · Bârzava Nouă - Milova2024 · km 546.95–547.95 · 50 km/h · all trains · Săvîrșin - Vărădia2024 · km 490.1–494.05 · 30 km/h · all trains · Mintia - Brănișca2024 · km 496.7–497.7 · 30 km/h · all trains · Brănișca - Ilia2024 · km 531.32–531.42 · 30 km/h · all trains · St. Ilteu liniile 2 și 3 directe2024 · km 531.32–531.42 · 30 km/h · all trains · St. Ilteu liniile 2 și 3 directe2024 · km 562.52–563.7 · 30 km/h · all trains · St. Bătuța linia 2 directă20252025 · km 449.507–472.424 · 120 km/h · all trains · Ax st. Orăștie - Ax st. Simeria2025 · km 546.95–547.95 · 50 km/h · all trains · Săvîrșin - Vărădia2025 · km 491.65–492 · 30 km/h · all trains · Mintia - Brănișca2025 · km 492–494.9 · 30 km/h · all trains · Mintia - Brănișca2025 · km 496.7–497.7 · 30 km/h · all trains · Brănișca - Ilia2025 · km 504.8–504.9 · 30 km/h · all trains · St. Ilia linia 4 directă Cap Y2025 · km 531.32–531.42 · 30 km/h · all trains · St. Ilteu liniile 2 și 3 directe2025 · km 531.32–531.42 · 30 km/h · all trains · St. Ilteu liniile 2 și 3 directe2025 · km 559.3–559.9 · 30 km/h · all trains · Vărădia - Bătuța2025 · km 562.52–563.7 · 30 km/h · all trains · St. Bătuța linia 2 directă20262026 · km 449.507–472.428 · 120 km/h · all trains · Ax st. Orăștie - Ax st. Simeria2026 · km 449.507–472.428 · 120 km/h · all trains · Ax st. Orăștie - Ax st. Simeria2026 · km 554.6–555.15 · 70 km/h · all trains · Vărădia - Bârzava Nouă2026 · km 554.6–555.15 · 70 km/h · all trains · Vărădia - Bârzava Nouă2026 · km 564.35–564.85 · 70 km/h · all trains · Vărădia - Bârzava Nouă2026 · km 564.35–564.85 · 70 km/h · all trains · Vărădia - Bârzava Nouă2026 · km 503.983–514.267 · 60 km/h · all trains · Ax.St. Ilia – Ax.St. Câmpuri Surduc2026 · km 503.983–514.267 · 60 km/h · all trains · Ax.St. Ilia – Ax.St. Câmpuri Surduc2026 · km 488.054–503.983 · 50 km/h · all trains · Ax St. Mintia - Ax.St. Ilia2026 · km 546.95–547.95 · 50 km/h · all trains · Săvîrșin - Vărădia2026 · km 504.8–504.9 · 30 km/h · all trains · St. Ilia linia 4 directă Cap Y2026 · km 504.8–504.9 · 30 km/h · all trains · St. Ilia linia 3 directă Cap Y2026 · km 508.35–508.4 · 30 km/h · all trains · Ilia – Câmpuri Surduc2026 · km 508.35–508.4 · 30 km/h · all trains · Ilia – Câmpuri Surduc450500550600km 394
The line's restrictions in the bulletin for 1–10 April of each year. Colour shows the speed allowed; faded shades are restrictions that bind only some trains.

up to 20 km/h30–40 km/h50–60 km/h70 km/h or more

Open the line on the map

AprilKm of restricted trackRestrictions
2021171.323
202252.615
202331.913
202434.114
202530.210
202685.414
April 2026 · 14
  • 120 km 449.507–472.428 · Ax st. Orăștie - Ax st. Simeria
  • 120 km 449.507–472.428 · Track II · Ax st. Orăștie - Ax st. Simeria
  • 50 km 488.054–503.983 · Ax St. Mintia - Ax.St. Ilia
  • 60 km 503.983–514.267 · Ax.St. Ilia – Ax.St. Câmpuri Surduc
  • 60 km 503.983–514.267 · Track II · Ax.St. Ilia – Ax.St. Câmpuri Surduc
  • 30 km 504.800–504.900 · St. Ilia linia 4 directă Cap Y
  • 30 km 504.800–504.900 · Track II · St. Ilia linia 3 directă Cap Y
  • 30 km 508.350–508.400 · Ilia – Câmpuri Surduc
  • 30 km 508.350–508.400 · Track II · Ilia – Câmpuri Surduc
  • 50 km 546.950–547.950 · Săvîrșin - Vărădia
  • 70 km 554.600–555.150 · Vărădia - Bârzava Nouă
  • 70 km 554.600–555.150 · Track II · Vărădia - Bârzava Nouă
  • 70 km 564.350–564.850 · Vărădia - Bârzava Nouă
  • 70 km 564.350–564.850 · Track II · Vărădia - Bârzava Nouă
April 2025 · 10
  • 120 km 449.507–472.424 · Ax st. Orăștie - Ax st. Simeria
  • 30 km 491.650–492.000 · Mintia - Brănișca
  • 30 km 492.000–494.900 · Track II · Mintia - Brănișca
  • 30 km 496.700–497.700 · Brănișca - Ilia
  • 30 km 504.800–504.900 · St. Ilia linia 4 directă Cap Y
  • 30 km 531.320–531.420 · St. Ilteu liniile 2 și 3 directe
  • 30 km 531.320–531.420 · Track II · St. Ilteu liniile 2 și 3 directe
  • 50 km 546.950–547.950 · Track II · Săvîrșin - Vărădia
  • 30 km 559.300–559.900 · Vărădia - Bătuța
  • 30 km 562.520–563.700 · St. Bătuța linia 2 directă
April 2024 · 14
  • 140 km 394.450–394.900 · Ramificație Sântimbru- Ramificație Podu Mureș
  • 140 km 394.450–394.900 · Track II · Ramificație Sântimbru- Ramificație Podu Mureș
  • 120 km 449.507–472.424 · Ax st. Orăștie - Ax st. Simeria
  • 70 km 459.700–460.000 · Orăștie - Simeria
  • 30 km 490.100–494.050 · Track II · Mintia - Brănișca
  • 30 km 496.700–497.700 · Brănișca - Ilia
  • 30 km 531.320–531.420 · St. Ilteu liniile 2 și 3 directe
  • 30 km 531.320–531.420 · Track II · St. Ilteu liniile 2 și 3 directe
  • 50 km 546.950–547.950 · Track II · Săvîrșin - Vărădia
  • 30 km 562.520–563.700 · St. Bătuța linia 2 directă
  • 70 km 574.350–575.800 · Bârzava Nouă - Milova
  • 70 km 574.350–575.800 · Track II · Bârzava Nouă - Milova
  • 100 km 625.650–625.700 · Glogovăț - Arad
  • 100 km 625.650–625.700 · Track II · Glogovăț - Arad
April 2023 · 13
  • 100 km 402.520–402.570 · Coșlariu - Sântimbru
  • 100 km 402.520–402.570 · Track II · Coșlariu - Sântimbru
  • 120 km 449.507–472.424 · Ax st. Orăștie - Ax st. Simeria
  • 30 km 471.050–471.120 · St. Simeria linia 4 directă, Cap X
  • 30 km 490.000–494.050 · Track II · Mintia - Brănișca
  • 30 km 496.700–497.700 · Brănișca - Ilia
  • 30 km 526.200–526.250 · Track II · Câmpuri Surduc - Zam
  • 30 km 541.500–541.600 · Track II · St. Săvîrșin linia 3 directă
  • 50 km 546.950–547.950 · Track II · Săvîrșin - Vărădia
  • 30 km 562.520–563.700 · St. Bătuța linia 2 directă
  • 70 km 574.350–575.800 · Track II · Bârzava Nouă - Milova
  • 100 km 625.650–625.700 · Glogovăț - Arad
  • 70 km 625.650–625.700 · Track II · Glogovăț - Arad
April 2022 · 15
  • 120 km 437.208–449.508 · Track II · Ax st. Șibot - Ax st. Orăștie
  • 100 km 449.509–472.424 · Track II · Ax st. Orăștie - Ax st. Simeria
  • 30 km 471.050–471.100 · Track II · Orăștie - Simeria
  • 30 km 473.540–473.660 · Simeria - Deva
  • 30 km 490.500–494.050 · Track II · Mintia - Brănișca
  • 30 km 496.700–497.700 · Brănișca - Ilia
  • 30 km 510.550–517.400 · Ilia - Zam
  • 30 km 524.300–527.700 · Cîmpuri Surduc - Zam și st. Zam linia 2 directă
  • 30 km 541.500–541.600 · Track II · St. Săvîrșin linia 3 directă
  • 50 km 546.950–547.950 · Track II · Săvîrșin - Vărădia
  • 30 km 562.520–563.700 · St. Bătuța linia 2 directă
  • 30 km 574.580–574.630 · Bârzava Nouă - Conop
  • 30 km 582.925–582.975 · Conop - Milova
  • 100 km 625.650–625.700 · Glogovăț - Arad
  • 100 km 625.650–625.700 · Track II · Glogovăț - Arad
April 2021 · 23
  • 100 km 402.520–502.570 · Coșlariu - Sântimbru
  • 120 km 437.208–449.508 · Track II · Ax st. Șibot - Ax st. Orăștie
  • 100 km 449.509–472.424 · Track II · Ax st. Orăștie - Ax st. Simeria
  • 50 km 459.000–459.100 · Track II · Orăștie - Simeria
  • 30 km 471.050–471.100 · Track II · Orăștie - Simeria
  • 30 km 491.580–491.730 · Track II · Mintia - Brănișca
  • 30 km 499.150–500.500 · Track II · Brănișca - Ilia
  • 30 km 502.650–505.000 · Track II · Brănișca - Ilia și St. Ilia linia 3 directă
  • 30 km 510.800–517.400 · St. Gurasada linia 2 directă și Gurasada - Zam
  • 30 km 524.300–529.300 · Cîmpuri Surduc - Ilteu
  • 30 km 533.900–536.750 · Zam - Ilteu, st. Ilteu linia 2 directă și Ilteu - Săvîrșin
  • 30 km 540.850–540.950 · Ilteu - Săvîrșin
  • 30 km 544.100–547.800 · Ilteu - Săvîrșin linia 3 directă Săvîrșin și Săvîrșin - Vărădia
  • 30 km 552.350–552.700 · St. Vărădia linia 3 directă proiectată Cap X
  • 30 km 562.520–563.700 · St. Bătuța linia 2 directă
  • 30 km 574.580–574.630 · Bârzava Nouă - Conop
  • 30 km 582.925–582.975 · Conop - Milova
  • 30 km 588.400–588.500 · Milova - Radna
  • 30 km 594.750–594.950 · St. Radna linia 3 directă Cap X
  • 120 km 604.918–611.200 · Track II · St. Ghioroc linia 3 directă și Ghioroc - Glogovăț
  • 120 km 605.600–611.200 · St. Ghioroc linia 2 directă și Ghioroc - Glogovăț
  • 70 km 625.650–625.700 · Glogovăț - Arad
  • 100 km 625.650–625.700 · Track II · Glogovăț - Arad

Kilometres of track: on a double line, a restriction on both tracks counts twice. Overlapping restrictions on the same track count once.