Speed restrictions on CFR line 328 Arad – Oradea, 2021–2026

CFR line 328 Arad – Oradea: 3.1 km of track under speed restrictions in April 2021, 3.3 km in April 2026, of which 0.0 km in every April since 2021.

Utvinișu NouChișineu-Criș20212021 · km 3–6.15 · 50 km/h · all trains · Arad – Utvinișu Nou20222022 · km 60.45–60.95 · 70 km/h · all trains · Zerind - Ciumeghiu2022 · km 3–6.15 · 50 km/h · all trains · Arad – Utvinișu Nou20232023 · km 47–47.05 · 70 km/h · all trains · St. Chișineu Criș linia 3 directă2023 · km 53.9–53.95 · 70 km/h · all trains · Chișineu Criș - Ciumeghiu2023 · km 3–6.15 · 50 km/h · all trains · Arad – Utvinișu Nou20242024 · km 3.75–3.9 · 70 km/h · all trains · Arad – Utvinișu Nou2024 · km 47–47.05 · 70 km/h · all trains · St. Chișineu Criș linia 3 directă2024 · km 3–8.6 · 50 km/h · all trains · Arad – Utvinișu Nou St. Utvinișu Nou linia 2 directă, Utvinișu Nou - S2024 · km 53.9–53.95 · 50 km/h · all trains · Chișineu Criș - Ciumeghiu20252025 · km 38–42 · 70 km/h · all trains · Șimand – Nădab și linia 3 directă St. Nădab2025 · km 47–47.05 · 70 km/h · all trains · St. Chișineu Criș linia 3 directă2025 · km 54.9–55.8 · 70 km/h · all trains · Chișineu Criș - Ciumeghiu2025 · km 3–9.3 · 50 km/h · all trains · Arad – Utvinișu Nou St. Utvinișu Nou linia 2 directă, Utvinișu Nou - S20262026 · km 42.9–43.32 · 70 km/h · all trains · St.Nadab-linia III directă, porțiunea între PJ -S6 și semnal intrare N2026 · km 47–47.05 · 70 km/h · all trains · St. Chișineu Criș linia 3 directă2026 · km 54.9–55.8 · 70 km/h · all trains · Chișineu Criș - Ciumeghiu2026 · km 7.4–9.3 · 50 km/h · all trains · St. Utvinișu Nou linia 2 directă, Utvinișu Nou - Sântana102030405060km 3
The line's restrictions in the bulletin for 1–10 April of each year. Colour shows the speed allowed; faded shades are restrictions that bind only some trains.

up to 20 km/h30–40 km/h50–60 km/h70 km/h or more

Open the line on the map

AprilKm of restricted trackRestrictions
20213.11
20223.62
20233.23
20245.84
202511.24
20263.34
April 2026 · 4
  • 50 km 7.400–9.300 · Track II · St. Utvinișu Nou linia 2 directă, Utvinișu Nou - Sântana
  • 70 km 42.900–43.320 · St.Nadab-linia III directă, porțiunea între PJ -S6 și semnal intrare N
  • 70 km 47.000–47.050 · St. Chișineu Criș linia 3 directă
  • 70 km 54.900–55.800 · Chișineu Criș - Ciumeghiu
April 2025 · 4
  • 50 km 3.000–9.300 · Track II · Arad – Utvinișu Nou St. Utvinișu Nou linia 2 directă, Utvinișu Nou - S
  • 70 km 38.000–42.000 · Șimand – Nădab și linia 3 directă St. Nădab
  • 70 km 47.000–47.050 · St. Chișineu Criș linia 3 directă
  • 70 km 54.900–55.800 · Chișineu Criș - Ciumeghiu
April 2024 · 4
  • 50 km 3.000–8.600 · Track II · Arad – Utvinișu Nou St. Utvinișu Nou linia 2 directă, Utvinișu Nou - S
  • 70 km 3.750–3.900 · Arad – Utvinișu Nou
  • 70 km 47.000–47.050 · St. Chișineu Criș linia 3 directă
  • 50 km 53.900–53.950 · Chișineu Criș - Ciumeghiu
April 2023 · 3
  • 50 km 3.000–6.150 · Track II · Arad – Utvinișu Nou
  • 70 km 47.000–47.050 · St. Chișineu Criș linia 3 directă
  • 70 km 53.900–53.950 · Chișineu Criș - Ciumeghiu
April 2022 · 2
  • 50 km 3.000–6.150 · Track II · Arad – Utvinișu Nou
  • 70 km 60.450–60.950 · Zerind - Ciumeghiu
April 2021 · 1
  • 50 km 3.000–6.150 · Track II · Arad – Utvinișu Nou

Kilometres of track: on a double line, a restriction on both tracks counts twice. Overlapping restrictions on the same track count once.