Speed restrictions on CFR line 328 Arad – Oradea, 2021–2026
CFR line 328 Arad – Oradea: 3.1 km of track under speed restrictions in April 2021, 3.3 km in April 2026, of which 0.0 km in every April since 2021.
up to 20 km/h30–40 km/h50–60 km/h70 km/h or more
| April | Km of restricted track | Restrictions |
|---|---|---|
| 2021 | 3.1 | 1 |
| 2022 | 3.6 | 2 |
| 2023 | 3.2 | 3 |
| 2024 | 5.8 | 4 |
| 2025 | 11.2 | 4 |
| 2026 | 3.3 | 4 |
April 2026 · 4
- 50 km 7.400–9.300 · Track II · St. Utvinișu Nou linia 2 directă, Utvinișu Nou - Sântana
- 70 km 42.900–43.320 · St.Nadab-linia III directă, porțiunea între PJ -S6 și semnal intrare N
- 70 km 47.000–47.050 · St. Chișineu Criș linia 3 directă
- 70 km 54.900–55.800 · Chișineu Criș - Ciumeghiu
April 2025 · 4
- 50 km 3.000–9.300 · Track II · Arad – Utvinișu Nou St. Utvinișu Nou linia 2 directă, Utvinișu Nou - S
- 70 km 38.000–42.000 · Șimand – Nădab și linia 3 directă St. Nădab
- 70 km 47.000–47.050 · St. Chișineu Criș linia 3 directă
- 70 km 54.900–55.800 · Chișineu Criș - Ciumeghiu
April 2024 · 4
- 50 km 3.000–8.600 · Track II · Arad – Utvinișu Nou St. Utvinișu Nou linia 2 directă, Utvinișu Nou - S
- 70 km 3.750–3.900 · Arad – Utvinișu Nou
- 70 km 47.000–47.050 · St. Chișineu Criș linia 3 directă
- 50 km 53.900–53.950 · Chișineu Criș - Ciumeghiu
April 2023 · 3
- 50 km 3.000–6.150 · Track II · Arad – Utvinișu Nou
- 70 km 47.000–47.050 · St. Chișineu Criș linia 3 directă
- 70 km 53.900–53.950 · Chișineu Criș - Ciumeghiu
April 2022 · 2
- 50 km 3.000–6.150 · Track II · Arad – Utvinișu Nou
- 70 km 60.450–60.950 · Zerind - Ciumeghiu
April 2021 · 1
- 50 km 3.000–6.150 · Track II · Arad – Utvinișu Nou
Kilometres of track: on a double line, a restriction on both tracks counts twice. Overlapping restrictions on the same track count once.