Marius ComperComandău inclined plane
Română

Comandău inclined plane

The wagon that climbed without an engine

On the incline between Covasna and Comandău, a wagon full of timber rode a platform downhill. At the other end of the same cable, an empty wagon went up. Follow both wagons and see how they passed halfway up the incline.

Move the wagons ↓
Logs stacked on a wagon fitted on the incline platform between trees.
The load sits in the wagon. The platform below it carries the wagon on the sloping tracks. Photograph from 1994. (Source · Oliver Wileczelek, 24 June 1994 · converted to WebP · CC BY-SA 3.0)

Lower station

Logs stacked on a wagon fitted on the incline platform between trees.
The load sits in the wagon. The platform below it carries the wagon on the sloping tracks. Photograph from 1994. (Source · Oliver Wileczelek, 24 June 1994 · converted to WebP · CC BY-SA 3.0)

Lower station

Look underneath the load

The Valea Zânelor valley begins at the edge of Covasna. Follow the forest railway upstream and you reach the place where the wagons changed how they travelled. Oliver Wileczelek’s photograph from June 1994 shows a wagon loaded with timber. Under its wheels sits a second structure: the platform that held it on the incline. [4] [1]

From Comandău came timber cut in the upper Bâsca basin. At Covasna station it could transfer to the wider railway network. Between the forest lines, the inclined installation moved whole wagons, load and all. [3] [2]

Logs stacked on a wagon fitted on the incline platform between trees.
The load sits in the wagon. The platform below it carries the wagon on the sloping tracks. Photograph from 1994. (Source · Oliver Wileczelek, 24 June 1994 · converted to WebP · CC BY-SA 3.0)
Three railway sections between Covasna station and Comandău, with the incline in the middle.
Narrow-gauge lines continued at both ends. Distances beyond the incline are schematic. (Source)

Forest railway

Two lines with an incline between them

The technical inventory accompanying the 2019 council decision gives the incline as 1,236 m long and identifies three stations. Steam locomotives worked the timber railway on a 760 mm gauge, measured between the inner faces of the rails. The incline platforms ran on their own broader track. [1] [2]

Follow one loaded wagon towards Covasna. It arrives at the upper end by train, rides down on a platform and waits for another locomotive at the bottom. The change happens underneath the wagon. The timber travels down with it. [3]

Three railway sections between Covasna station and Comandău, with the incline in the middle.
Narrow-gauge lines continued at both ends. Distances beyond the incline are schematic. (Source)
A harnessed horse beside a logging wagon, with the upper station behind it.
At the upper station a horse shunted the narrow-gauge wagon. Photograph from June 1994. (Source · Oliver Wileczelek, 24 June 1994 · converted to WebP · CC BY-SA 3.0)

One cable

Set the pair in motion

The loaded wagon starts at the top. An empty one waits below. The cable linking their platforms turns at the upper station. As the top platform descends, the bottom one must advance in the opposite direction. Move the control and watch how far the pair travels together. [2] [3]

The difference in weight sets the system in motion. The energy released by the loaded wagon can lift the empty wagon and cover losses to friction and braking. The upper station controlled the speed. The model couples the platforms’ positions without estimating operating speed. [2] [1]

Two wagon platforms, one loaded and one empty, are joined by a cable running to the upper station.
Opposite directions and one shared cable. The movement illustrates the principle at a pace you set. (Source)
Logs stacked on a wagon fitted on the incline platform between trees.
The load sits in the wagon. The platform below it carries the wagon on the sloping tracks. Photograph from 1994. (Source · Oliver Wileczelek, 24 June 1994 · converted to WebP · CC BY-SA 3.0)

Passing station

Watch them make room

Halfway through the run, the two platforms needed the same stretch of hillside. The 2019 inventory describes two parallel tracks in the middle station. Towards the upper station, after they rejoined, it describes three rails: one was shared. [1]

Stop the slider near the middle. In profile, the platforms have reached almost the same height. In plan, they sit on different tracks. You need both views to read the installation. [1]

In plan, the line splits into two at the midpoint and the platforms sit alongside each other.
Two parallel tracks let the platforms pass. The turnout detail is schematic. (Source)
Two wagon platforms, one loaded and one empty, are joined by a cable running to the upper station.
Opposite directions and one shared cable. The movement illustrates the principle at a pace you set. (Source)

Upper station

This is where the horse comes in

Another photograph from the same day shows a horse by a wagon beside the upper building. The museum describes horse shunting at both ends of the incline. The animals moved wagons short distances between the platforms and the tracks where locomotives took over. [5] [2]

The brake house was also at the upper station. The loaded wagon had enough energy to lift the empty one, and the person at the brake controlled how quickly it happened. A complete cycle depended on work at both stations. [3] [2]

A harnessed horse beside a logging wagon, with the upper station behind it.
At the upper station a horse shunted the narrow-gauge wagon. Photograph from June 1994. (Source · Oliver Wileczelek, 24 June 1994 · converted to WebP · CC BY-SA 3.0)
Diagram of a pulley near the upper terminus and shunting at the station.
The upper house controlled braking. The wheel marks the cable path; its internal machinery is shown schematically. (Source)

After the last run

What remains on the hillside

The shutdown unfolded in stages. The town hall records damage after the 1995 storm, the brake house fire of 1997 and repairs that allowed a final period of operation. In 1999 the incline was placed in conservation. The 2019 inventory describes the installation as destroyed. [3] [1]

Look again at the photograph from the lower station. The wagon wheels rested on the platform rails, the platform ran along the broader rails, and the cable carried the motion to its partner. The loaded wagon coming down supplied the energy for the empty wagon’s trip up. [4] [2]

The former incline is traced along the hillside.
The 2019 inventory describes the installation as destroyed and records salvageable track material. (Source)
Logs stacked on a wagon fitted on the incline platform between trees.
The load sits in the wagon. The platform below it carries the wagon on the sloping tracks. Photograph from 1994. (Source · Oliver Wileczelek, 24 June 1994 · converted to WebP · CC BY-SA 3.0)

Sources

The photographic archive preserves both ends of the incline while it was still working.

  1. Covasna council, 2019 technical inventoryThe 1,236 m incline, its three stations, passing tracks and the inventory of the former forest railway.
  2. National Museum of the Eastern CarpathiansThe two platforms, the controls in the upper station and shunting at the ends.
  3. Covasna town hall, the inclined planeReported rise, transfer between lines, and the chronology of the last period of operation.
  4. Lower station, photograph from 1994The loaded wagon on its platform, photographed from the foot of the incline.
  5. Upper station, photograph from 1994A wagon, horse and station building can be seen at the upper end.