At Cornet, between the mountain and the Olt River, the railway passed beneath the entrance to a monastery founded in 1666. A photograph published in June 1938 and architects’ drawings show what remained above the line.

Start the story ↓
The rails enter the arch. The church towers are visible at the upper right.
The rails enter the arch. The church towers are visible at the upper right. (Source)

The photograph

The rails enter the arch. The church towers are visible at the upper right.
The rails enter the arch. The church towers are visible at the upper right. (Source)

The photograph

Two entrances in one frame

Follow the rails in the photograph published in 1938. They enter an arch low in the frame. Part of the enclosure sits above it, with the church towers to the right. On this narrow stretch of the Olt valley, a train and people entering the monastery pass at different levels.

The 1967 drawing opens up the view. The courtyard gate is in the wall in front of the church. The dark opening below and to its right is the tunnel mouth. The two openings serve different purposes even though they can overlap in photographs.

The rails enter the arch. The church towers are visible at the upper right.
The rails enter the arch. The church towers are visible at the upper right. (Source)
Drawing Rv.322.01 looks from the railway towards the enclosure wall. The monastery entrance is above, the tunnel mouth at the lower right.
Drawing Rv.322.01 looks from the railway towards the enclosure wall. The monastery entrance is above, the tunnel mouth at the lower right. (Source)

1860

A visit before the railway

The monastery founded by Mareș Băjescu in 1666 had a small church within an enclosure. In 1860 Alexandru Odobescu was received by the caretaker, Constantin Ionescu, who lived there with his children. The visitor recorded the surrounding wall, ruined vaulted rooms, and a tomb slab being used as a step to the church.

The later plan helps distinguish the church from the spaces around it. It dates to 1967. Odobescu’s account tells us what condition the rooms were in when he visited.

Plan Rv.322.22 distinguishes the boundary walls from the church inside. The approach to the gate is on the left between two wall segments.
Plan Rv.322.22 distinguishes the boundary walls from the church inside. The approach to the gate is on the left between two wall segments. (Source)

1898

The new line changed the enclosure

The Cornet tunnel was built in 1898. According to the history published by the Archdiocese of Râmnic, the line passed beneath the gate and construction led to the demolition of the cells where monks lived. A new two-storey building went up on the right side of the church.

The diagram separates the two levels. The wall, courtyard entrance and tunnel mouth in the survey show how pedestrian access was retained above the line. The diagram gives no measurement of tunnel depth or length.

The diagram sets the pedestrian entrance and the railway at separate levels. The 1967 perspective shows the position of the tunnel mouth relative to the gate.
The diagram sets the pedestrian entrance and the railway at separate levels. The 1967 perspective shows the position of the tunnel mouth relative to the gate. (Source)

1921–1937

Estimates for church, gates and bastions

After the First World War, the Historical Monuments Commission documented further damage. Part of the monastery had been destroyed during the war. File 3534 holds correspondence with the monastery and the Civil Hospitals Board, measurements, cost estimates and a list of timber.

The file also records proposals to alter the building. The commission refused to approve a new door to the altar or replacing paving slabs with planks. The catalogue record establishes what was discussed and refused. Establishing what was built would require the works records.

The file record lists materials, measurements and requests. The commission refused requests to change the flooring and open a door.
The file record lists materials, measurements and requests. The commission refused requests to change the flooring and open a door. (Source)

The church

What remained above the railway

In the 1967 cutaway, the architects removed a wall from the drawing to show the two towers and the spaces below. In the photograph published in 1938 you can see them from outside, above the wall. Together the images show the same church whole and in section.

The records date three changes at Cornet. Odobescu had already seen ruins in 1860. The tunnel of 1898 changed the cells and entrance. The commission’s records deal with wartime damage. Return to the photograph and the rails, gate and towers tell you which parts of the story you can check on the ground.

Detail from Rv.322.16. The cutaway passes through the church and its towers. The tunnel is at the edge of the enclosure, near the gate.
Detail from Rv.322.16. The cutaway passes through the church and its towers. The tunnel is at the edge of the enclosure, near the gate. (Source)

Sources

The map marks the monastery enclosure at Tuțulești. The gate on the railway side is the point of reference.

  1. UAUIM survey archive, Cornet, Rv.322, 1967Plates .01, .16 and .22 by Ludovic Borbath, Marilena Constantinescu, Sorin Dobrescu, Petru Ivanovici, Sanda Moldovan, Clement Moldoveanu, Dana Nicolescu, Oliver Riti and Paul Veseli.
  2. Viața ilustrată, June 1938, year V, no. 6The photograph “Mănăstirea Cornet din Valea Oltului”, in the copy digitized by BCU Cluj.
  3. Alexandru Odobescu, his 1860 visit to CornetThe travel account as transcribed in Nicolae Moga’s Loviştene (Studii documentare).
  4. Archdiocese of Râmnic, history of Cornet MonasteryThe foundation in 1666, the tunnel of 1898, the demolition of the old cells and the new building.