Skip to the story
mariuscomper.uk Română
today

Bucharest · what was here

The meandering Dâmbovița

The Dâmbovița once looped through Bucharest: 9.7 kilometres of meanders, 49 mills along the river, islands and side arms. Between 1880 and 1883 its course was straightened. Between 1985 and 1988 the river became two stacked channels: a concrete trough carrying water above, and a sewage collector below. Scroll through three moments in the river's history, then search an address against the 1871 riverbed.

Scroll: you go back to 1789, on the free river.

The free river, 1789

Purcell's 1789 drawing shows the Dâmbovița entering at Ciurel and leaving at Văcărești, winding among neighbourhoods and mill weirs. It is a town sketch with approximate landmarks.

The river in the animation follows Pappasoglu's 1871 plan, the best map of the free river: 9.7 kilometres through the city, plus the Tanners' Gârlița and the mill leat. The first flood defences date from around 1775.

  • the 1871 bed, after Pappasoglu
  • today's streets
Dimitrie Papazoglu's 1871 map of Bucharest
Plan of Bucharest, 1871, by Dimitrie Papazoglu (1811–1892). Its meanders informed the animated route. Source and status: Wikimedia Commons, public domain (Public Domain Mark 1.0).

Mills and islands, 1852

On Borroczyn's 1852 plan the river is still wild — but the reproduction we work from is small and faded, so we show it as a reconstruction, with a question mark attached. What is certain: the city lived between waters. The quarter between the arms was called “între gârle” (between the brooks), and at the city's exit, by the slaughterhouse, there was still an island in 1852.

I. Teofilu's plan shows 49 mills along the Dâmbovița, counted before 1862. After the floods of 1864–65, the 1865 law abolished the river mills along with their dams and weirs.

The cut

The canal, 1880–83

On 21 November 1880 (old style), work began on a deep trench from Ciurel to below the Abator to protect Bucharest from river floods. The works lasted until 1883 (some sources say 1885, under the French engineer Boisguerin): the bed was deepened by 6 metres, its bottom lined with oak planking, and its banks reinforced. Twenty-metre quays and two water drops were built at Grozăvești and Vitan. The major channel could carry 220 cubic metres per second.

The straight line follows engineer Cerkez's 1880 canal proposal. The plan shows the intended route; written sources describe the works that were built. The canal cuts across the bends: in some places it crosses from one bank to the other, while side arms, islands and floodplain pools disappear. In the stretch covered by both plans, the canal is 15.9% shorter than the river: 4.304 versus 5.119 kilometres. Bridges crossed the reinforced banks; in 1889 there were 12, seven stone and five iron.

What came after

The canal did not stay as they dug it. In 1900 they removed the Grozăvești drop and trained the bed upstream, to Ciurel. Between 1900 and 1950 they built the great sewers: six on the right bank, eighteen on the left. In 1942 a new rectification began, between the Ciurel weir and Roșu commune.

From Ciurel (91.43 metres) to the city exit below Abator (63.10 metres), the right bank falls by 28.33 metres.

The double river

Concrete, 1985–88

Between 1985 and 1988, Lacul Morii was built upstream of Grozăvești and the Argeș–Dâmbovița–Ialomița basins were connected. Through the city, clean water now runs in a concrete channel; a collector carries wastewater underground to the sewer system.

Today

Today the Dâmbovița runs straight between concrete walls. On today's map, the 1871 riverbed may pass beneath streets, apartment blocks and courtyards.

Search your address below: the map knows 8,625 addresses on 534 streets, on a 500-metre strip along the old bed.

Where did the river run by this address?

Pick the year, then turn the map with the mouse or a finger. The wheel, the two-finger pinch or the + and − buttons zoom in and out.

We cover 8,625 addresses on 534 streets within 500 metres of the 1871 bed or the canal line. The old bed has a median position error of about 127 metres, so the result shows proximity to the route rather than an exact location.

The river in figures

Every figure comes from our measurements on the plans or from the sources below; method and errors are in the next section.

MeasureValueSource
Main bed, 18719.7 kmPappasoglu trace
Tanners' Gârlița + mill leat1.4 + 2.1 kmPappasoglu trace
Projected canal, 18805.7 kmCerkez trace
Shortening in the shared window15.9%4.304 vs 5.119 km
Mills on the Teofilu plan49Cebuc, BMIM
Bridges in 188912 (7 stone, 5 iron)Giurescu 1966
Ciurel–Abator right-bank fall28.33 mGiurescu 1966
Major bed capacity220 m³/s (1880–85 canal)ASTR 2012

How we rebuilt the river

The 1871 bed

Major Pappasoglu's 1871 plan is the best map of the free river. We fitted it to today's map against 21 churches using an affine transform: the median error is 127 metres, and 80% of points fall within 215 metres of their fitted positions. A thin-plate-spline warp produced a larger error, so we publish the affine fit and its residuals. On the fitted plan we traced the main bed (9.716 km), the Tanners' Gârlița (1.373 km) and the mill leat (2.070 km).

The 1880 canal

Engineer Cerkez's 1880 plan, scale 1:10,000, shows the proposed canal: the new cut in blue and abandoned meanders in green. We fitted it against six churches (median error 88 metres) and traced 15 points along the cut: 5.743 km on the original points, 5.729 km after resampling at 80 metres. The line's ends separate from the 1871 bed; at the west end the gap exceeds a kilometre. This trace reproduces the proposal; written sources describe what was built between 1880 and 1883.

The 1789 and 1852 drawings

For 1789 we use Purcell's drawing (sheet 9), and for 1852 a small reproduction after Borroczyn. Both are sketches fitted approximately to today's map, with errors of hundreds of metres. In the 3D animation, the 1789 and 1852 riverbeds follow the route measured in 1871; the earlier plans remain historical images.

Today's river and the streets

Today's bed and streets come from OpenStreetMap (ODbL licence). Engineers Stematiu and Teodorescu (ASTR, 2012) describe the 1985–88 works: a concrete channel at the surface and a collector underground. The 3D model shows the channel; the collector is explained in the text. The river, canal and streets are drawn wider than reality so they can be seen from above.

The date of Teofilu's plan showing 49 mills remains uncertain. A map drawn by eng. Teofil is dated June 1864 (Duțu, n.37, MIB archive, inv. 42464); Cebuc gives no date, and the mills were abolished after 1862. Sources also differ on the canal's completion year: 1883 in Giurescu and 1885 in ASTR. The southern blue line on the Cerkez plan remains unidentified and is not used here.

Sources