The junction station

The junction station
Where the plan began
At Dângeni, the Iași–Dorohoi railway passes the station proposed as the starting point of a new line. In 1957, Săveni district leaders asked the Ministry of Railways to extend it from here to Săveni and onward to Rădăuți-Prut. Historian Octavian-Liviu Șovan’s article publishes the memorandum they sent and reconstructs the proposal. [1]
The 1:20,000 military map shows Dângeni before the Săveni railway: the village name, valleys and surrounding slopes. It helps locate the story but does not draw the route requested in 1957. The proposed railway below is shown as a document-based schematic, not a georeferenced alignment. [7] [1]

Construction dates
1912, 1916 or 1917?
Șovan writes that work on the Dângeni–Rădăuți-Prut railway began in 1916 and was abandoned in August as hostilities began. The 1957 memorandum, by contrast, says the embankment had been built in 1917. A 2026 local feature quoting the railway monograph gives 1912 for the early works. These are three different dates from three different accounts. [1] [4]
None of the pages publishes technical files or construction plans that would show whether the writers mean different stages by “began”. The 1957 memorandum had reason to say the embankment already existed: it presented the project as finishable with limited work. The graphic keeps 1912, 1916 and 1917 as separate claims. [1] [4]

The 1957 memorandum
The request to complete the line
In 1957, Săveni district leaders asked for a railway on the existing embankment, from Dângeni through Săveni to Rădăuți-Prut. In the transcription published by Șovan, the memorandum calls it “an urgent necessity”. It links the railway to grain transport and opening the county’s north to the rest of the country. [1]
This was an administrative proposal, not an investment approval. The memorandum’s authors tried to persuade the Ministry of Railways with distances, transport costs and possible revenue. That makes the document useful but limited: it shows the arguments local officials sent, not what the ministry or CFR accepted. [1]

Local access
How close a station might have been
The memorandum compared each commune’s distance to existing stations with its distance to the proposed embankment. For Hănești, it listed six kilometres to the nearest station versus two to the planned line. For Vlăsinești, it compared 15 kilometres to Ungureni station with 500 metres to the new railway; for Săveni, 12 kilometres with 200 metres. [1]
These figures show why the district argued for the project, but they are calculations in a political memorandum, not modern road measurements or verified rail distances. “Close” refers to the planned embankment, not necessarily a station that would be built or a safe walking distance. [1]
The project’s arithmetic
Reported costs, projected income
For 1955, the memorandum totalled 5,672,000 lei paid by district enterprises for transport. It then calculated that the railway might bring CFR about 9,373,000 lei a year, combining estimated freight with a probable two million lei from passenger travel. [1]
The first total is presented as a past cost; the second is a projection, dependent on building the line and increasing agricultural transport. The memorandum does not independently verify these figures or show what revenue would actually have been collected. We pair them to see how the case was made, not to measure the finances of a railway that was never completed. [1]
A partial build
The railway reached Săveni
Săveni’s urban plan says the Dângeni–Săveni section opened in 1991 and the project was meant to continue towards Săveni-Prut. A local feature, citing the railway monograph, dates the resumption of modern work to 1987 and says the 17.4 kilometres to Săveni opened on 5 July 1991. [2] [4]
The feature says a further ten kilometres towards Darabani were built but never entered service. Only the section to Săveni opened. The city plan confirms the year but gives neither distance nor day; those details come from the local account citing the monograph and should be read as such. [4] [2]

When did trains stop?
Two timelines after 1991
Săveni’s urban plan says Dângeni–Săveni traffic was interrupted in 1998 after landslides at Vlăsinești. A local feature based on the railway monograph gives a different sequence: damage after about a year of service, repairs and restricted trains through 1994, then the end of passenger service. [2] [4]
The sources do not reconcile 1994 and 1998; neither provides the operating log that could establish when trains were suspended or resumed. The urban plan links the problem to landslides, a poorly consolidated embankment and the short Vlăsinești route instead of the Hănești alternative, which it calls safer. [2] [4]
The station still serves trains
A different railway from the interrupted branch
Dângeni station appears in the planned timetable for 14 December 2025–12 December 2026, with trains to Iași and Dorohoi. The operators’ open data, processed by Tren123, lists 22 planned departures on a typical timetable day. The station still serves the existing railway; the Săveni section is separate. [5]
That distinction matters when you look at the place today. Trains through Dângeni do not run on the interrupted railway to Săveni. The map in this story shows the village and terrain, while the timetable shows current service; neither source is a recent inspection of the abandoned embankment. [5] [7]