Heat substation 24 C5/2: hours of below-standard hot water, 2025–2026
Sector 3
168Reconstructed hours with a notice of hot water below standard · in 2025
250 national threshold: 250 hours per year and contract · local threshold: total waiver
Calendar dates with at least one captured notice: 12
The notices concern at least part of the substation’s area. They do not measure the temperature in a flat and do not establish that compensation is owed.
| Year | Hot water below standard, hours | Dates with a notice | Heating below standard, hours | Hot water off, hours | Heating off, hours |
|---|---|---|---|---|---|
| 2025 | 168 | 12 | 0 | 656 | 132 |
| 2026* | 425 | 51 | 179 | 231 | 56 |
* The 2025 and 2026 figures are not directly comparable: 2026 is incomplete, and usable captures cover 54.8% of its hours against 69.9% in 2025.
Last captured notice (original, in Romanian) · 2026-09-17 18:53
Lipsa parametri pentru livrare apa calda de consum
• Bld Theodor Pallady - bl. N1, N2, N3-N3A, N3B, N4A • Ale Perişoru - bl. N4B, N5
Streets named in the notices
- Bld Theodor Pallady
- Ale Perişoru
Outages and their causes, on this substation’s page in “Why your hot water is off”