1969

1969
A working hall at Măgurele
In a photograph from 1969, three people in lab coats stand at instruments on a platform with a railing. They are in the hall of the research reactor at Măgurele, near Bucharest. The National History Museum holds the photograph in its collection on the communist period. [1]
Light falls through high windows. The platform and its instruments fill the lower half of the frame. The photograph shows the workplace, while other records explain the installation’s purpose and what happened after its working life. [1] [3]


1956–1957
The institute took shape outside Bucharest
The institute’s history describes the 1956 division of the Academy’s original Institute of Physics. Horia Hulubei directed the Institute of Atomic Physics at Măgurele. The Bucharest Institute of Physics was based at the university’s Faculty of Physics. [2]
Two Soviet-built facilities came into operation at Măgurele, the reactor and a cyclotron, a kind of particle accelerator. The reactor started operating in 1957. [2] [3]
During operation
Experiments and radioisotopes
The reactor served nuclear physics experiments and produced radioisotopes, radioactive forms of elements. It operated for four decades. The regulator reports a maximum thermal power of 2 MW, a measure of the heat produced. [3]
It was called a research reactor because of what people used it for. The photograph shows instruments on the platform, and the report describes their facility’s purpose. Electricity for the power grid came from other kinds of plant. [1] [3]

1997 and 2002
Between shutdown and the decommissioning decision
The reactor stopped operating in 1997. In 2002, the government ordered permanent shutdown for decommissioning and assigned the work to the institute that had operated it. [3] [4]
The two dates answer different questions. When did work with the reactor end? When was dismantling it formally decided? Article 1 sets out the decision for the second stage. [3] [4]
2013–2020
What decommissioning involved
The used fuel went back to its country of origin before dismantling. The project lead, Mitică Drăgușin, says the work of taking the installation apart began in 2013. In a December 2020 interview he described its completion and the measurements required before releasing the building. [5] [3]
The regulator records how the resulting waste was managed. Some went to the national repository at Băița Bihor after treatment at Măgurele. Decommissioning continued for years after the reactor stopped. [3] [5]
After decommissioning
The control room was kept
Drăgușin says the team kept the control room in its original form as a record of the installation. The report published in 2023 confirms that decommissioning was complete and that the reactor building and its site had been released from nuclear regulatory control. [5] [3]
The map marker identifies the institute area at the stop on Reactorului Street. The 1969 photograph, the 2002 decision and the 2023 report show the same facility at work, on paper and after dismantling. [6] [1] [4] [3]