A map fixes the valley before the major works

A map fixes the valley before the major works
On the map, the Lotru runs through a lived-in valley
The eHarta mosaic titled “Austrian maps (1910)” shows Mălaia, Voineasa, Ciungetu, Săliștea and Brezoi along the Lotru. At 1:200,000, the settlements and river are the key landmarks: today’s commune consists of communities linked by one valley, not a single point. [1]
The consulted sheet has no legible individual date; the mosaic is labelled nominally 1910. It predates the Lotru dams and does not draw the forest railway built from 1948. We use it to understand the geography before the engineering works, without plotting routes that are absent from it. [1]

Before the turbines, the valley moved timber
Rafts, roads and a railway for logs
Forests supported Lotru settlements through felling, processing and transport. Mălaia’s planning report says timber was floated down the Lotru and Olt before modern roads; the road from Brezoi towards Mălaia and Voineasa, built in 1908, eased log transport. [2]
From 1948, the valley gained a forest railway about 55 km long. The local plan gives its gauge as 0.7 m; Brezoi Town Hall specifies 760 mm. We do not have the engineering plan here to resolve the difference, so both measurements stay beside their sources. [2] [3]
The forest railway also carried passengers
Passenger carriages attached to work trains
A tourist guide from around 1965 says a narrow-gauge line ran between Brezoi and Voineasa and could also take people to Mălaia, Gura Latoriței, Rudaru and Voineasa. Passengers rode in carriages attached to work trains. A timber route also served as a public connection through the valley. [4]
A 1972 report describes the Brezoi–Voineasa journey as nearly 60 km and taking most of a day, with frequent stops. This is a reporter’s account of travel time, not a measurement of track length or a railway timetable. [5]
Hydropower construction changed travel through the valley
Beyond Brezoi, construction traffic moved onto new roads
In January 1972, a Scînteia tineretului report followed the road from Brezoi to Voineasa. It describes equipment arriving by rail at Brezoi and continuing on heavy road hauliers, as well as the new road cut and widened through the valley. [5]
The report then takes readers into the mountain galleries and to the Mălaia outlet, where water was due to emerge from the tunnels. The page belongs to the party press and presents the works in a celebratory register. Details about travel, galleries and machinery are contemporary observations; the official enthusiasm is part of how the account frames its story. [5]
The sources do not give the same year for the railway’s end
Sources give different years for the railway’s end
Brezoi Town Hall dates the road’s paving to 1969 and says timber transport by rail ended then. Mălaia’s planning report says the line operated until 1970. The difference may reflect how each source defines the end of transport, but railway records would be needed to decide. [3] [2]
We know the forest railway existed after 1948 and that the guide from around 1965 still described it as passenger access. The exact year of the last train does not appear in the sources consulted. Meanwhile, Lotru hydropower construction had begun in 1966, and work on the Brădișor dam started in 1973. [4] [6] [7]
At Mălaia, water passes through an 18 MW power station
The reservoir receives water turbined at Ciunget
The Lotru scheme works in stages. Mălaia’s tourism dossier says the reservoir collects water turbined at Ciunget and uses it again at the Mălaia power station, commissioned in 1978 with 18 MW. For an average hydrological year, the town hall gives an output of 34 GWh. [6]
The Mălaia station turbines water collected after Ciunget, then releases it downstream towards Brădișor dam. The diagram follows the functional order described in the local dossier; it does not include every intake, tunnel or flow variation in the wider system. [6] [7]
At Brădișor, the power station sits inside the mountain
A dam, a cavern and a tunnel to the Olt
Work on Brădișor dam began in 1973 and ended in 1982. Mălaia Town Hall describes a concrete arch dam 62 m high and 220 m long, with its power station in a cavern 330 m downstream and below the slope. [7]
The station has 115 MW installed, and water exits towards the Olt through a 13,227 m tailrace. The 1980 report names workers, describes underground excavation and records gallery sections being opened. The engineering figures and the construction-site voices come from different sources, each observing at a different scale. [7] [10]
The old map and today’s valley tell different parts
The train no longer runs; water still moves through the system
On the old map, the settlements and course of the Lotru are visible before the engineering works. Today’s photograph shows Brădișor dam, the reservoir and the wooded slope. Together, the two images help explain the place, but the photograph cannot show the valley before construction and the map does not pinpoint every section of the forest railway. [1] [8]
This project’s pin marks the Mălaia power-station building. It gives the story a precise address, while the sources followed here stretch from the forest route between Brezoi and Voineasa to Brădișor’s tailrace reaching the Olt. The sources describe routes and changing functions, but do not provide a verified overlay of the former rails on today’s roads and reservoirs. [9] [2] [7]