#From Corbu to Vama Veche, 43 summers
Each row is a 25-metre piece of shore, from Corbu at the top to Vama Veche at the bottom; each column is a summer, from 1984 to 2026. The colour shows where the water’s edge stood that summer against the summers of 1984–93: ochre, further out; blue, further in.
The ochre blocks that start abruptly are the sand fills. The gaps are ports, cliffs without a beach and lines that pass breakwaters.
#The breakwater at Midia
North of Midia port, at Corbu, the water’s edge moved 43 metres out to sea between the mid-1980s and 2009–13. South of the breakwater, at Mamaia Centre, it moved 12 metres inland over the same years.
That fits the JICA study’s explanation: the breakwater stops the sand waves carry from the Danube before it reaches Năvodari and Mamaia. Except that the beach at Corbu grew most 6–10 km north of the breakwater, not right next to it, and its northern end retreated.
#2015: Mamaia South and Tomis
The first stage of the programme put sand on five beaches in 2015, between new or rebuilt breakwaters and groynes. The water’s edge moved 95 metres out at Mamaia South and 115 metres at Tomis; the marine institute’s GPS surveys give 86.4 and 105–118 metres.
Eleven summers later the water’s edge is still there: the beaches are boxed in between breakwaters.
#Mamaia, 2021
Between November 2020 and April 2021, Boskalis’s dredger “Gateway” pumped sand from offshore onto 6.95 km of beach, according to the contractor; the satellite sees the change on 6.7 km and measures 88 hectares of new beach between summer 2020 and summer 2021; in the middle of the resort the water’s edge moved about 200 metres out to sea.
The stated target was a beach 100 metres wide. In places it came out more than twice as wide.
#The centre loses, the north gains
Since summer 2021 the water’s edge at Mamaia Centre has moved 34 metres back, close to what news reports said in autumn 2026 (“no longer 200 metres, but 160”). At Mamaia North, over the same five summers, it moved 18 metres out.
The satellite cannot see sand under water, but one explanation fits: waves move sand along the shore, and at Mamaia, according to the JICA study, more of it northwards than southwards. The new beach is spreading: the centre loses, the northern end gains. The figures are corrected for the movement shared by the untouched beaches.
#Eforie, 2022–2023
At Eforie, sand was pumped from September 2022 to December 2023 into seven beach cells boxed in by new breakwaters. The satellite measures 39 hectares; in summer 2026 there are still 39 hectares.
#Olimp, Neptun, Venus: 2024
Between Neptun and Venus, sand pumping began in June 2024; in January 2025 the contractor announced the Olimp, Jupiter–Neptun and Balta Mangalia lots finished. The satellite measures 62 hectares on the stretches with new sand (5.6 km). After two summers the water’s edge is still there; it is too early to say more.
#Costinești and Saturn: building sites
At Costinești, by summer 2026 sand shows on only 1.1 km: 8.9 hectares of the 26–27 announced. At Saturn, pumping began in September 2026. On the images of 3, 5 and 15 October the water’s edge stood 0, 16 and 36 metres further out than in summer, on the 15 measurable lines: the beach was growing as the works went on.
#The beaches without new sand
Vama Veche is not in the programme. At 2 Mai a fill was planned for autumn 2026; it does not show on the images up to 15 October. The water’s edge of 2009–13 stood 11 metres and 7 metres further in there than in the mid-1980s, close to how much the movement shared by the unfilled beaches varied between 2016 and 2026: 11 metres.