Where the railway crosses water
Where the railway crosses water
Borcea is not the Danube crossing at Cernavodă
The bridge at Fetești crosses the Borcea branch of the Danube, just east of town. On the way to Cernavodă, trains then crossed the Ezer floodplain and the Danube’s main channel. These were three separate structures, not one long bridge. [1] [5]
This story stops at the first crossing, over Borcea. In 1916 the retreating Romanian army destroyed this bridge for military reasons; the Cernavodă bridge was damaged separately and remained standing. [2]
What the Fetești bridge looked like
Three 140-metre spans
The 1945 engineering account gives the Borcea bridge and its floodplain viaducts a combined length of 970 m. The main river channel was crossed by three metal spans, each 140 m long. [1]
The bridge belonged to a 21 km railway route with several crossings and flood-prone ground. This plate enlarges only the bridge over the Borcea channel; the approach viaducts are reduced to a band so the difference between the main spans and floodplain is clear. [1]
In the calendar published after the opening, the lower-left photograph shows the viaducts leading up to the taller girders. The modern photograph looks at the bridge from the later crossing over the same branch. [6] [4]


October 1916
The Borcea spans fall and the railway link breaks
During the Romanian army’s retreat in 1916, the three main spans over Borcea were destroyed. A 1945 engineering article includes a technical photograph of the wreckage and describes separate damage to the bridge at Cernavodă. [2] [1]
The distinction matters: the main-Danube bridge remained standing, although damaged; at Borcea, the central spans fell. Our diagram interprets the written account and figure 7. It is not a copy of the photograph or a blast plan. [2] [1]
The temporary connection
Trains reached the bank. Freight crossed by ferry
Rail traffic between Fetești and Cernavodă returned in stages. The 1945 engineering account says that after the Cernavodă bridge was repaired in February 1918, locomotives could run as far as Borcea, where passengers and freight changed conveyance. [1]
A later study records a German ferry with improvised railway tracks on both banks. After Romanian administration returned, the ferry was improved and worked until December 1921. Only then did the Fetești–Cernavodă line return to normal service. [2] [1]
The project approved in 1920
Reconstruction combined new and reused girders
The file reviewed by the Higher Technical Council specified a new girder from Reșița Works and two independent 101.76 m girders brought from Hungary. They were recovered materials received as war reparations. The project was reviewed in April 1920, and Reșița undertook to build and install the new girder within eleven months. [3]
The 1945 engineering account confirms that normal traffic resumed in December 1921. The photograph looks from the newer combined road-and-rail bridge towards the old railway bridge. It shows two neighbouring generations, not the 1895 structure in untouched form. [1] [4]