1863 · the forest inspection
1863 · the forest inspection
A closed forest, timber cut, guards requested
In the summer of 1863, two county officials inspected forests in the Poienile de sub Munte mountains. In the records of the time, the locality — called Ruszpolyaná Kirva — included Repedea. Ioan Boroica’s study cites the inspection report: the forests were officially “closed”, yet conifer timber was cut in the Cvașnița valley without a written contract or tax payment. [1]
The commission proposed guards and oversight at river junctions because timber travelled by water. The report reveals a basic tension: the forest was governed by rules, while river transport linked cutting sites to places much farther away. [1]
1856–1922 · forest management
A shared forest with divided rights
The Poienile de sub Munte forest common was established in 1856. Lawyers for the Teleki family and former serf-tenants discussed shares, timber rights and income from other resources. A 1857 proposal required applicants to prove that they or their ancestors had lived in the village in 1820 and fulfilled their obligations. [1]
In a 1922 register, a forest common shared by Poienile and Repedea covered 2,772.5 cadastral iugăre, about 1,600 hectares. Boroica notes that he has not identified a summary register of forest commons in Romanian Maramureș from before 1918. These records show how rights and oversight worked, not a complete map of every parcel. [1] [4]
Kiroia Valley · rafting
There was not enough water; people synchronized it
In the memories gathered by Vasile Popovici, rafts were assembled at Berescu on the Kiroia, then checked in the commune centre near its junction with the Ruscova. From there, raftsmen travelled down the Ruscova and Vișeu to Bocicoiu Mare, where they handed the timber to other crews for the journey on the Tisa. The account names the handover and route, not just the cargo. [2]
Low water required careful coordination. Keepers opened gates upstream first and then downstream; the surge needed to reach the raft about an hour ahead. Launches were spaced ten to fifteen minutes apart. Popovici recorded the local estimate that about 183,000 m³ of conifer timber travelled this way before the railway was built. It remains an oral estimate, not a total taken from a ledger. [2]
Work and technique
Each raft was a guided structure
Popovici describes a raft made of one to five sections, known locally as “table”. The front section, the buzar, used thinner logs; the codar brought up the rear. He puts 20–30 cubic metres of timber in one section, or 100–150 for five. The steering oar at the front consisted of a seven- to eight-metre pole called a condei and a beech blade. [2]
Raftsmen cut and stacked logs in winter, then lashed the rafts in spring as the snow melted. Crews of three or five accompanied the rafts along each stretch of the route and intervened when needed. Bends, rocks, sudden rain and river junctions made the route hazardous; the account says rafting required a permit and was forbidden at night. This is a picture preserved through local testimony, not a surviving work log. [2]
1929–1944 · the sawmill
A mill changed where the rafts stopped
The local account says industrialist Arnold Kacika opened a sawmill at Lujana in 1929. Rafts stopped by Maier Onciul’s butcher’s shop and house, were broken up, and the timber was carried to the mill. Popovici lists an 80 hp steam engine, two saws, two lathes and about 150 workers; he says the mill produced 10,000–15,000 m³ of sawn timber in 1944. [2]
The same author records that Kacika, the mill’s Jewish owner, was deported by Hungarian authorities in spring 1944 for racial reasons. The mill reportedly burned that autumn as German troops retreated. These details come from a local history compiled in 2019. The article reproduces no deportation order, production ledger or dated photograph of the fire. [2]
After 1945 · transport changes
Timber moved from the river to the rails
After the war, a narrow-gauge line connected the mill with the Tomnatic area and then Leordina. Popovici says the little train took over timber transport and raftsmen stopped working on the Kiroia. He dates the line’s dismantling to 1970–1972 and says the old dams silted up. I found no cadastral railway plan or closure order in the sources used to confirm each date. [2]
Two kinds of evidence preserve this story. Boroica’s study cites the county file from 1863, which investigated cutting and called for river guards. Popovici, director of Repedea’s cultural centre, recorded memories of workers, rafts and the sawmill in 2019. The first is an administrative record known here through an archival citation; the second is oral memory, with figures and episodes that must be read as such. Together they explain why forest control and the movement of timber cannot be separated. [1] [2]