Telciu station
Telciu station
A station at the end of the line
Before the Second World War, the open section from Salva ran about 15 km to Telciu. Look where the tracks ended before following the next stage of construction. [1] [2]
Switch to the completed line. The same place becomes a stop between Salva and Vișeu de Jos. [1] [4]
Above the valley
Why the line needs a viaduct
In the Dealul Ștefăniței photograph, the train crosses high above the curving road. The piers bridge the vertical difference between the valley and the track. [3]
Compare the photograph and schematic section. The track stays on the deck while the ground falls away. The drawing is explanatory. [2] [3]

Through the ridge
When the ground rises above the track
A viaduct crosses a valley. In the mountain section the line also had to pass through a ridge, using tunnels. The historical study describes the tunnel between Dealul Ștefăniței and Săcel. [2]
Read this as a conceptual section. For part of the route the rail lies below the ground. At the viaduct it stays above the valley. [2]
The work site
A line opened at the end of 1949
Pre-war construction was interrupted. The missing section was finished after the war, and the complete line entered service at the end of 1949. [1] [2]
Oral history also records people who came to the construction site for private reasons in the early years of communist rule. The Radio Romania account includes one such testimony. [1]
The complete line
How a station helps you read the line
Return to Telciu. Back towards Salva is the section opened before the war. Towards Vișeu lie the crossings that took longer to complete. [1] [2]
The station gives a landmark for a change a modern timetable would hide. Today’s stop was once the end of the line. [1] [4]