The height
Three sources, nearly the same number
Wikipedia gives 3,776.24 m, the OpenStreetMap record says 3776.2, and nippon.com writes 3,776 metres. The differences are rounding; the value normally used is 3,776 m.1,2,16

Japan · active volcano · 3,776 m
Japan's highest mountain is an active volcano that has not erupted for more than three centuries. It is a place of pilgrimage and the subject of Hokusai's prints, and for about ten weeks a year it can be climbed, for a fee and only between set hours.1,5,4,9
Most people climb Fuji for the sunrise, which in summer comes as early as 4:30 to 5:00. Climbers used to leave the fifth station in the evening and walk through the night. Under the 2026 rules, anyone without an overnight hut reservation could not start between 2 pm and 3 am the following day. The official table gives between 5 and 9 hours for the ascent. Starting at 3 am, when the trailheads reopen, means reaching the top after sunrise: even the shortest trail takes about 5 hours.9,8,14
1The mountain
Mount Fuji is an active stratovolcano on the island of Honshu and the highest mountain in Japan: 3,776 m. Among volcanoes on Asian islands, only Kerinci, on Sumatra, is higher.1,2
It stands on the boundary between Shizuoka and Yamanashi prefectures, inside Fuji-Hakone-Izu National Park, about 100 km south-west of Tokyo. On clear days it can be seen from the capital.1,3
It last erupted in the winter of 1707–08. It has not erupted since, but it is still considered an active volcano.5,6
The height
Wikipedia gives 3,776.24 m, the OpenStreetMap record says 3776.2, and nippon.com writes 3,776 metres. The differences are rounding; the value normally used is 3,776 m.1,2,16
The place
Yamanashi Prefecture lies to the north, Shizuoka to the south and east. The mountain is inside Fuji-Hakone-Izu National Park.1,3,8
The summit
The highest point is called Kengamine (剣ヶ峰). It sits on the crater rim, next to the former weather station, on the opposite side from where the Yoshida trail reaches the top.1,9,16
The crater
The summit crater can be walked around in about an hour. The rim path, Ohachimeguri, was scheduled to open in 2026 from 10 July to 10 September.4,9
The chapter's photographs

2The eruption
On 16 December 1707, 49 days after the great Hōei earthquake, the mountain's south-eastern flank erupted. The Smithsonian catalogue gives 24 February 1708 as an uncertain end date; nippon.com describes eruptions continuing intermittently for two weeks. The sources report different dates and durations, which this page does not reconcile. It is the last confirmed eruption. It is named after the Hōei era, in whose fourth year it happened, and has a Volcanic Explosivity Index of 5 (VEI 5).5,6,2,34
Ash fell over eastern Japan and reached Edo, the city now called Tokyo. Landslides and starvation followed.5,6
Three more eruptions were reported between 1708 and 1854. None has been confirmed.5
The calendar
The Hōei earthquake struck 49 days earlier. The Smithsonian catalogue dates the eruption from 16 December 1707 to 24 February 1708 (70 days), but marks the end date as uncertain; nippon.com says the eruptions continued intermittently for two weeks. The sources report different dates and durations, and this page does not reconcile them.5,2,34
What it left
The eruption opened three new vents on the flank (east-south-east, in Wikipedia's wording) and created the Hōei Crater. The area is called Mount Hōei (宝永山). The main crater can be visited from the Fujinomiya and Gotemba trails.5,6,16
The ash
NASA gives 95 km from the volcano to Edo, to the north-east; Wikipedia says “almost 100 kilometers”. After the ash came landslides and starvation.5,6
The past
About 700,000 years ago the Komitake volcano became active where the mountain stands today. Some 100,000 years ago began the stage known as Kofuji (“old Fuji”), which eventually built a peak 3,000 m high. The present stage, Shinfuji (“new Fuji”), began about 5,000 years ago according to nippon.com; NASA writes that the currently active volcano began forming 11,000 to 8,000 years ago. From historical times come the Enryaku eruption (800–802), whose ash buried the Ashigara road, and the Jōgan eruption (864–866).2,6
The chapter's photographs

3The sacred mountain
Fuji was added to the World Heritage List in 2013, at the 37th session of the UNESCO committee, as a cultural property under the title “Fujisan, sacred place and source of artistic inspiration”. The listing is number 1418 and rests on cultural criteria iii and vi.7,1
According to UNESCO, the mountain has “inspired artists and poets and been the object of pilgrimage for centuries”. It is sacred to both Shinto and Buddhist pilgrims, and a shrine at the summit is dedicated to the goddess Konohanasakuya-hime.1,14
The protected property covers 20,702.1 ha, with a buffer zone of 49,627.7 ha around it.1
UNESCO
The listed property covers 20,702.1 ha, or 207 km², and the buffer zone 49,627.7 ha, or 496 km². In the drawing the two areas are at the same scale.1,7
The year 663
The first ascent is attributed to En no Ozunu (also spelled En no Odzunu), also called En no Gyōja, and dated to 663. The summit was held sacred from ancient times and for that reason was long forbidden to women.1
The shrine
For centuries Fuji has been a sacred site for Shinto and Buddhist pilgrims. The summit shrine is dedicated to the mountain's goddess, Konohanasakuya-hime, as is the Shinto shrine Fujisan Hongū Sengen Taisha, one of the 25 sites of cultural interest that UNESCO recognises around the mountain.1,14
The chapter's photographs

4Hokusai
The print “South Wind, Clear Sky”, known as “Red Fuji”, was first published around 1830 in Katsushika Hokusai's series Thirty-six Views of Mount Fuji.25
Hokusai also drew the mountain in the series One Hundred Views of Mount Fuji. One of its plates shows the small crater of a secondary eruption site on the south-western slope.5
Art is part of the mountain's official status: UNESCO listed it as a “sacred place and source of artistic inspiration”.7
The print
The mountain fills the right of the sheet: a brick-red cone with streaks of snow at the top and a green forest at its foot, under a blue sky with rows of white clouds.25
The other series
In One Hundred Views of Mount Fuji, Hokusai also drew the small crater of a secondary eruption site on the mountain's south-western slope.5
The title
The title under which the mountain was listed has two parts: “sacred place” and “source of artistic inspiration”. According to UNESCO, Fuji has “inspired artists and poets”.7,1
The chapter's photographs

5The trails
Fuji is climbed on four official trails. Each starts from a “fifth station”, which can be reached by road, and the official table gives each trail's starting altitude, length and approximate time up: Yoshida (2,305 m, 6.8 km, about 6 hours), Fujinomiya (2,400 m, 4.3 km, about 5 hours), Subashiri (2,000 m, 6.9 km, about 7 hours) and Gotemba (1,440 m, 10.5 km, about 9 hours).8,9
The season is short. In 2026 Yoshida and Subashiri opened on 1 July, Fujinomiya and Gotemba on 10 July, and all four closed on 10 September. For the rest of the year the trails to the summit are closed, and the official site calls climbing outside the season “extremely dangerous”.4,9
Most climbers time their ascent to see the sunrise from the summit: in summer, as early as 4:30 to 5:00.9
The trails
Fujinomiya starts at 2,400 m and is 4.3 km long, both up and down. Gotemba starts at 1,440 m and is 10.5 km up and 8.4 km down. Yoshida (2,305 m; 6.8 km up, 7 km down) is the only trail on the Yamanashi side. Subashiri (2,000 m; 6.9 km up, 6.2 km down) joins Yoshida around the eighth station.8,9
The season
From 1 July to 10 September, counting both days, there are 72 days. On Fujinomiya and Gotemba, open from 10 July, there are 63. Outside the season the huts are closed, and so are all trails to the summit.4,9
The sunrise
In summer the sun rises as early as 4:30 to 5:00, and early morning is when the mountain is most likely to be free of cloud. The japan-guide site recommends a two-day climb: on the first day to a hut around the seventh or eighth station, a few hours of sleep, then on to the summit before dawn.9,20
The year 1860
The first foreigner to climb Fuji was Sir Rutherford Alcock, in September 1860. He took 8 hours to go up and 3 hours to come down. Today's official table gives 5 to 9 hours up and 3 to 4 down from the fifth stations; the source does not say where Alcock started.1,8
Worked from the official table
Choose a trail and the time you set off from the trailhead. The sum adds the official table's time up to your starting time, with no stops.8,9
2026 rules: trailhead closed 2 pm – 3 am next day sunrise from 4:30
Under the 2026 rules, no trail can get you to the summit just in time for sunrise during its open hours: leave at 3 am and you arrive at 8:00 at the earliest; leave before 2 pm without stopping and you arrive by about 11 pm at the latest, then wait at the top for at least five and a half hours. What the rules leave is a night in a hut, or a long wait.8,9,14
| Trail | Prefecture | Start | Up | Down |
|---|---|---|---|---|
| Yoshida | Yamanashi | 2,305 m | 6.8 km · ~6 h | 7 km · ~4 h |
| Subashiri | Shizuoka | 2,000 m | 6.9 km · ~7 h | 6.2 km · ~4 h |
| Gotemba | Shizuoka | 1,440 m | 10.5 km · ~9 h | 8.4 km · ~4 h |
| Fujinomiya | Shizuoka | 2,400 m | 4.3 km · ~5 h | 4.3 km · ~3 h |
The times are the official site’s estimates (about 5, 6, 7 and 9 hours), without breaks; everyone’s pace differs. The dial shows the 2026 access hours and overnight-hut exception; it is a comparison, not a climbing plan. Vertically the altitudes are to scale; the mountain’s outline is drawn.
The chapter's photographs

6The 2026 climbing rules
The 2026 fee was ¥4,000 per person for each climb on all four trails. On Yoshida, you could reserve and pay online or pay at the fifth station; advance booking was recommended, not required, and same-day payment was possible. On Fujinomiya, Gotemba and Subashiri, registration and a safety lesson were required before climbing. If you had no QR permit, you could complete the learning, submit the forms and pay at the fifth station. Trail registration did not reserve a hut, and overnight-hut guests still paid the fee.30,31,32,33
Under the 2026 rules, the trailheads were closed from 2 pm until 3 am the following day; an overnight hut reservation was needed to start during those hours. Yoshida also had a daily cap of 4,000 climbers, excluding overnight-hut guests. The three Shizuoka trails had no set daily cap.30,31,32,33
These figures and access rules describe the 2026 season, which ended on 10 September.30,31,32,33
The fee
Each 2026 climb cost ¥4,000 per person on all four trails. Yoshida allowed online payment or payment at the fifth station; booking ahead was recommended, not required. The three Shizuoka trails required registration and a safety lesson, with on-site learning, forms and payment available at the fifth station. A hut booking was separate, and hut guests still paid. Yoshida also checked climbers at the gate for hiking shoes, warm clothing, and separate rain jacket and trousers; anyone without them could not climb.30,31,32,33
The hours
Under the 2026 rules, the trailheads closed from 2 pm to 3 am the following day. An overnight hut booking was needed to start during those hours. Yoshida’s daily cap was 4,000 climbers, excluding overnight-hut guests; Shizuoka’s three trails had no set daily cap.30,31,32,33
Trail-counter records
The Ministry of the Environment published its final 2026 total on 30 September: 240,436 readings from infrared counters near each route’s eighth station, covering each trail from its opening through 10 September. The route counts were Yoshida 134,777, Fujinomiya 60,866, Subashiri 27,129 and Gotemba 17,664. Counter data are missing for four days on Subashiri and five on Gotemba. These records do not identify distinct people; the ministry says missing data and differing measurement periods affect comparisons. The total is 117.2% of 2025 and 102.0% of 2019.27,28,29
The crowding
A 2026 press report described severe crowding on paths just below the summit at sunrise and said officials feared that one fall could trigger a chain reaction. That account is separate from the ministry’s final total elsewhere on this page: its infrared counters sit near each route’s eighth station and do not measure crowding near the summit. At the foot of the mountain, japan-guide warns that peak cherry-blossom crowds at the Chureito pagoda in Arakurayama Sengen Park bring overcrowding, noise, litter, traffic and trespassing.15,10,27,28
The chapter's photographs

7The lakes
At the northern foot of the mountain, in Yamanashi Prefecture, at ~1,000 m above sea level, lie five lakes: Kawaguchi, Yamanaka, Sai, Shōji and Motosu. They give the region its name, Fujigoko, the Fuji Five Lakes.12,11
The lakes were created by earlier eruptions of the mountain. About 100,000 people live in the region, roughly 54,000 of them in its principal city, Fujiyoshida.12
The most popular trail starts here too: the Yoshida fifth station is the easiest one to reach from the lakes and from central Tokyo.9
The lakes
Kawaguchi, Yamanaka, Sai, Shōji and Motosu lie in an arc around the northern half of the mountain. All five were created by earlier eruptions of the mountain.12,11
The city
Fujiyoshida, with roughly 54,000 inhabitants, is the region's principal city. The view of the Chureito pagoda with the mountain is taken from here, and the Yoshida fifth station is the easiest one to reach from the lakes.12,9
The map
The summit, the Hōei Crater, the four starting stations and the five lakes are placed at their OpenStreetMap coordinates. The lakes all lie north of the summit; three of the four starting stations lie to its south and east.16
Each point on the map is an OpenStreetMap object, identified by its number.
Thirteen points pinned by OSM id: eight nodes, one way (the crater) and four relations (the lakes). The way and relation markers sit at the centre of their outlines. No altitude in the text comes from the map's tags. The drawings on this page were made for it. Where a drawing is to scale, its label says so. Map data: © OpenStreetMap contributors, ODbL 1.0, 2026-10-07.16
8The volcano today
The Japan Meteorological Agency has published a history of the mountain's volcanic activity, one of the sources of nippon.com's chronology. NASA notes that there have been no eruptions since 1707, that steam was seen at the summit from 1780 to 1820, and that the volcano is “considered active”.2,6
For 72 years a staffed weather station worked at the summit, the highest in Japan, listed by Wikipedia at 3,780 m. Its observers watched radar sweeps for typhoons and heavy rain. It closed in September 2004 and was replaced by an automated system.1
More than 300 years of quiet, nippon.com writes, do not change the fact that Fuji is an active volcano to this day.2
The monitoring
NASA mentions steam seen at the summit between 1780 and 1820. The nippon.com chronology also lists volcanic gas from the summit crater from the mid-nineteenth century until the 1960s, and deep earthquakes in 2000–01.6,2
The weather station
The summit weather station, listed by Wikipedia at 3,780 m, was staffed for 72 years. That figure sits above the 3,776.24 m summit figure above; Wikipedia's article carries both without reconciling them. It closed in September 2004, when an automated system replaced it.1
The snow
The cone, exceptionally symmetrical, is covered in snow for about five months of the year. The photograph was taken at sunset on 19 March 2025.1,26
The chapter's photographs

Small numbers in the text point to their sources. The Ministry of the Environment’s final 2026 total comes from infrared counters near each trail’s eighth station; route counts, missing days and the limits of those records appear beside it. Access procedures describe the 2026 season, and climbing times are the official site’s estimates.