Marius Comper RO

Oravița–Anina mountain railway · Banat, 1862–1863

Steyerdorf and how much it could haul up to Anina

In 1862, engineers at StEG, a private Austrian railway company, worked out what it would take to haul 25 empty coal wagons uphill from Oravița to Anina, in the part of the Banat that is now in western Romania. The engine had to cope with gradients rising 20 m per kilometre and curves with a radius of 114 m. The engineers built Steyerdorf to meet those demands and tested it in Vienna with a 200.5 t train. Choose the number of wagons and see how far it gets on a profile reconstructed from historical station levels.

Grip between wheels and rails

In the simulation, Steyerdorf can haul up to 29 wagons to Anina at 1/8 and up to 25 at 1/9. The engineers designed it for 25.

The coal line

The Oravița–Anina railway was completed by the Imperial-Royal Privileged Austrian State Railway Company (StEG), a private company that had taken over the state's project in 1855, chiefly to carry coal from the mines around Anina to the railway that ran to Baziaș, on the Danube. Freight traffic began on 15 December 1863; the line opened to public traffic only in November 1869. At opening it was 33.04 km long, 21.54 km of it on a gradient, climbed 339 m and had 153 curves.

It has 14 tunnels and 10 viaducts, set out in the atlas of railway tunnels. Of those curves, 61 had a radius of 114 m. Loaded wagons ran downhill; they went up empty. The line starts at Oravița, the end of the first railway on the territory of today's Romania, the line to Baziaș, opened for coal in 1854.

An engine for one line

The StEG engineers had two limits that pulled against each other. To avoid slipping on the grade, the engine needed more than 42 t on its driving wheels; but the line's light rails could not carry more than 9.5 t per axle, so it needed five driving axles. An engine with five fixed axles would have been too long for 114 m curves.

The arrangement adopted was proposed by Pius Fink, one of the company's engineers: a frame with three axles under the boiler and a second frame with two axles, which carried part of the boiler and the water and fuel tanks. The two frames were joined by a pivot, and an intermediate shaft transmitted drive between the two sets of axles, so all five axles were powered. Completed in Vienna in February 1862, engine No. 500, Steyerdorf, weighed 46.75 t at its trial, with water and coal, all of it on driving wheels. It was shown in London in 1862 and made its first trial run on the line on 15 November 1863. No. 501 Krassova and No. 502 Gerliste followed in 1864, and No. 503 Lissava in 1867.

The arithmetic of 1862

The engineers based their design on 25 empty coal wagons of 4.25 t each. They rounded the 106.25 t "in round figures" to 110 tonnes for the calculation. The engine was to haul the train uphill at 11–15 km/h. The engineers took rolling resistance as 1/260 of the weight and added two and a half times as much again for the tight curves. With the 1 in 50 grade and the engine's own weight, they arrived at a pull of 5.17 tonnes-force.

For the wheels to give that pull without slipping, they assumed adhesion of 1/8 of the weight: the engine needed at least 41.36 t on its driving wheels; they asked for more than 42 t, to allow for partial slipping on the tight curves. Steyerdorf came out at 46.75 t.

The Vienna trial

On 26 February 1862, a cold day, Steyerdorf was tried on Vienna's belt railway, which has grades between 1 in 40 and 1 in 54. On its second run it hauled 22 wagons weighing 200.5 t in all, at an average of about 15 km/h. The company's report says the train was hauled "on a 1 in 50 grade" and that this means a pull of at least 5,600 kgf.

With the engineers' formula and adhesion, the heaviest train Steyerdorf can keep hauling at steady speed up a straight 1 in 50 is 198.3 t. The trial train weighed 200.5 t, 1.1% more. By the same formula, the trial train needed 5,896 kgf; at an adhesion coefficient of 1/8, the wheels could exert up to 5,844 kgf without slipping: a difference of less than 1%, which the report cannot resolve. The company wrote only that the pull was at least 5,600 kgf. The trial table does not show which stretch of the line each run used.

Design train, 25 wagons106.2 tHeaviest, straight track at 1 in 50, adhesion 1/8198.3 tThe 1862 trial train200.5 tHeaviest on the curving ramps, 1/8127.9 tHeaviest on the curving ramps, 1/9108.5 t
Train weight, without the engine. The calculation uses the 1862 engineers' formula and adhesion.

The climb to Anina

On the Oravița–Anina line the train first runs almost 9 km mostly level, over six viaducts. From Majdan, at today's Brădișoru de Jos, the line climbs at 20 per thousand for 5,188 m to Lișava, then for another 10,942 m to Krassova station, later Gârliște, with a short level stretch in the middle of the Jitin viaduct. The two ramps at 20 per thousand give a climb of 322.6 m; between the station levels there are 326.2 m.

In this calculation, on the curving ramps, adhesion of 1/8 takes at most 29 empty wagons up to Anina. At 1/9, the lower adhesion StEG thought enough, the 25-wagon design train just gets through. With the design train and 1/8, the calculation gives 2 h 11 min of running. Service was harder: in the early years the French engineer Édouard Collignon recorded 18 empty wagons uphill, usually at about 6 km/h and at most 8, with the engine modified (42.4 t on its driving wheels) and a 15 t supply van. Today CFR Călători, Romania's national passenger operator, gives regional train R 9695 a journey time of 2 h 02 min, from 11:15 to 13:17.

Share the train

The link keeps the train and adhesion you chose.

Sources and method

The train is driven along the line's profile step by step: the pull is the smaller of adhesion (1/8 or 1/9 of the engine's 46.75 t) and the design power, 205 horsepower, divided by speed. Resistance follows the 1862 engineers' formula: the weight of engine and train times the grade plus 1/260, with rolling resistance taken three and a half times on the ramps with 114 m curves. Speed is capped at 25 km/h, and power is taken as a constant 205 metric horsepower, an assumption. The curve factor is applied along the whole of each ramp, as the engineers did, although the ramps also have straight stretches. The profile is rebuilt through the historical station levels published by Árpád Jancsó (above the Adriatic datum); the ramp ends are estimated. Viaducts and tunnels are drawn with the length and height from the inventory; the number of arches is schematic. The 1862 figures are from the company's report for the London Exhibition.

  1. Société autrichienne I. R. P. des chemins de fer de l'État, „Description de la locomotive de montagne «Steierdorf»”, în Notices sur les objets envoyés à l'Exposition de Londres de l'année 1862, Viena 1862, pp. 91–126. cnum.cnam.fr The design train, resistances and 1/8 adhesion (p. 95), power (p. 99), weight (pp. 102, 123), the run table of 26 February 1862 (p. 124), the conclusion and the 1/9 adhesion (p. 125).
  2. Á. Jancsó, Az Oravica–Anina hegyi vasút története, Tudomány- és Technikatörténeti Füzetek 7, Erdélyi Múzeum-Egyesület, Cluj. eme.ro The engine and its sisters (pp. 65–67); station levels above the Adriatic datum (pp. 83–86).
  3. Á. Jancsó, Műtárgyak a Jaszenova–Oravica–Anina-vasútvonalon, Tudomány- és Technikatörténeti Füzetek 10. mtak.hu Opening dates and line figures (p. 10); gradients by section (pp. 16–17); tunnels and viaducts (tables 5 and 6, pp. 66–67, 116–118).
  4. É. Collignon, Études sur les chemins de fer de l'Autriche, Annales des Mines, s. 6, t. IX (1865). mines-paristech.fr Early service: 18 empty wagons uphill, 6–8 km/h (pp. 243–246).
  5. CFR Călători, Oravița–Anina, mersul trenurilor. cfrcalatori.ro R 9695, 11:15–13:17 (checked 21 November 2026).